A water diversion tunnel and construction method technology, which is applied in the field of surge chamber structure and water diversion tunnel pressure regulation structure, can solve the problems of large structure height, huge engineering investment, and high construction cost, so as to meet the pressure regulation requirements, save engineering investment, and construction Quick and easy effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0022] Now take certain diversion type development hydroelectric power station project as example, the present invention will be further described.
[0023] A hydropower project is located in the western canyon area of the Yunnan-Guizhou Plateau. It is a diversion-type development with a design head of 90m and a design reference flow rate of 106m3 / s. The water diversion line is 3km long. Through analysis and calculation, it is necessary to install a pressure regulating structure at the 2.7km position to adjust the water hammer pressure. The 2.7km in front of it is a 6m pressurized water diversion tunnel in Dongjing, followed by a penstock with an inner diameter of 6m. into the power plant. The location of the pressure regulating building is a strong mountain with a buried depth of nearly 400m, so it is not suitable to arrange an open surge well. If a conventional underground cavern surge chamber is used, the net section diameter of the cavern is calculated to be 28m, the ef...