High arch dam construction diversion tunnel structure and design method thereof
A technology for constructing diversion and high arch dams, applied in the field of diversion tunnel structure, can solve the problems that the diversion tunnel structure cannot meet higher requirements, and achieve the effect of favorable dam structure, reduced gate size and reduced investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0029] Such as Figure 1 to Figure 4 As shown in, the diversion tunnel structure for high arch dam construction according to the present invention includes a diversion tunnel whose inlet port communicates with the river channel upstream of the upstream cofferdam 1, and whose outlet port communicates with the river channel downstream of the downstream cofferdam 2. Flow tunnel comprises high hole 3 and low hole 4, and the bottom plate elevation of described high hole is higher than the bottom plate elevation of low hole; Connected with the traffic road on the downstream side of the river; during the non-flood season, only through the low hole 4 diversion, and during this period, the floor elevation Hgr of the entrance 31 of the high hole is higher than the water level hr in the river, and the exit of the high hole The floor elevation Hgc of the ...