Ventilation construction method of single head and multiple lanes in plateau long tunnel
A construction method and multi-lane technology, which can be used in mine/tunnel ventilation, earth-moving drilling, mining equipment, etc., and can solve the problems of large number of tunnels, long ventilation distance, and difficult construction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0064] Such as Figure 4 Shown, a kind of plateau long tunnel single head multi-lane ventilation construction method of the present invention, the plateau long tunnel of construction is positioned on the plateau and length is greater than the tunnel of 5km; image 3, one side of the main tunnel 2 of the constructed plateau long tunnel is provided with a tunnel inclined shaft 1; The middle connection section between the outlet sections 2-2, the tunnel inclined shaft 1 intersects with the middle connection section and the intersection between them is the intersection of the inclined shaft, and the middle connection section is the auxiliary construction section of the inclined shaft And it is divided into the inclined shaft auxiliary construction entrance section 2-3 and the inclined shaft auxiliary construction exit section 2-4 with the inclined shaft intersection as the boundary, the tunnel entrance section 2-1, the inclined shaft auxiliary construction entrance section 2- 3. ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com