Arch Column Method for Building Large Underground Structures in Shallowly Buried Rock
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A technology of underground structure and arch column method, which is applied in underground chambers, mining equipment, earthwork drilling and mining, etc. It can solve the problems of difficult deformation control, high construction risk, and low construction efficiency, so as to reduce construction risk and avoid top arching The effect of falling and large construction space
Active Publication Date: 2017-08-25
BEIJING URBAN CONSTR DESIGN & DEV GRP CO
View PDF5 Cites 0 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0003] The purpose of the present invention is to propose a construction method for building multi-layer and multi-span underground structures in shallow buried rock formations, which solves the problems of many excavation divisions, low construction efficiency, high construction risk, and difficulty in deformation control existing in the traditional underground excavation construction method and other problems, forming a method of convenient construction, high efficiency, low construction risk, good control of formation deformation, and low cost when building large-scale underground structures in shallow buried rock formations
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0053] see Figure 1-Figure 7 Shown: implementation example 1, the construction steps are as follows:
[0054]1. Enter the basement floor from the upper guide hole of the construction cross passage, excavate the upper guide hole 1 and 2 (the distance between the left and right guide holes is staggered), set up advance support (when necessary) and anchor rods, and implement initial support , The top steel diagonal brace, after entering the pilot tunnel from the construction cross passage, excavate the lower pilot tunnel 3 and pilot tunnel 4 (the pilot tunnels are staggered), manually dig holes under the center column with water drill, pour the pile foundation, and place it above the pile foundation Steel pipe columns are installed in sections, the interior of the column is filled with micro-expansion concrete, and the exterior of the column is backfilled with fine sand, supplemented by grouting measures if necessary;
[0055] 2. Lay the floor formwork in the middle cave, pour ...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
PUM
Login to view more
Abstract
The invention relates to an arch column method for building a large-scale underground structure in shallow buried rock stratums. The method comprises the following steps of: 1, separately excavating underground one-storey middle pilot tunnels, constructing primary supports, and constructing pile foundations and steel pipe columns at the positions of middle columns; 2, constructing secondary linings including underground one-storey floors, steel pipe columns, roof timbers, roof arches and the like, and waterproof layers in middle tunnels; 3, symmetrically excavating underground one-storey two-side pilot tunnels, constructing primary supports, and constructing pile foundations and side columns under side walls; 4, constructing secondary linings including floors, vertical walls, edge arches and the like in side tunnels and waterproof layers, and disassembling temporary supports; 5, under the protection of underground one-storey structures, downwards excavating an underground second-storey structure with large-scale machinery, besides, constructing side wall bolt spray supports or slab rib type anchored bolt retaining wall supports, and pouring underground second-storey floors, side walls and waterproof layers; and 6, sequentially downwards excavating a plurality of underground storeys, besides, constructing side wall supports, and pouring floors, side walls and waterproof layers of corresponding storeys. The method disclosed by the invention is convenient to construct, high in efficiency, small in construction risks, good in stratum deformation control, and low in building cost.
Description
technical field [0001] The invention relates to the technical field of underground construction engineering or tunnel engineering, in particular to the underground excavation construction technology for building multi-layer and multi-span underground structures in shallow buried rock formations, and is a construction method for building large-scale underground structures in shallow buried rock formations. Background technique [0002] At present, with the development of cities and the construction of rail transit, more and more multi-layer, multi-span and large-scale underground structures are built in shallow buried rock formations. In order to avoid the impact on ground transportation, buildings (structures) and pipelines, Usually have to adopt underground excavation method construction. Traditional underground excavation methods include pillar hole method, double side wall pilot pit method, arch cover method, hole pile method and so on. The column hole method first excav...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).