Hanging type unearthing device for bidirectional synchronous reversed construction and construction method
A two-way synchronous and suspended technology, applied in excavation, artificial islands, water conservancy projects, etc., can solve problems such as low efficiency, high cost, and difficult transportation, and achieve the goal of reducing reinforcement areas, occupying a small space, and reducing construction costs Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] see Figure 1 to Figure 7 , this embodiment discloses a suspended excavation device for two-way synchronous reverse construction, including: a transport box 5 for loading waste, a long-distance horizontal transport device and a suspended crane. The long-distance horizontal transport device can transport the transport box 5 to a designated loading point to unload waste and transport the empty transport box 5 back. The suspended crane is hung below the bottom of the structural floor beam of the first floor above the ground and straddled above the unearthed reserved hole on the ground floor. The suspended crane can place the transport box 5 on the structural floor of each underground floor. vertically lift in the unearthed reserved hole, and can move the transport box 5 horizontally, so that the transport box 5 is placed on the long-distance horizontal transport device or lifted away from the long-distance horizontal transport device.
[0047] The suspended unearthed devi...
Embodiment 2
[0057] read on Figure 1 to Figure 7 , this embodiment discloses the construction method of the suspended excavation device used for bidirectional synchronous reverse construction as described in Embodiment 1, including the following steps:
[0058] Step 1: Start construction on the basement roof B0 as the ground floor. After the concrete is cured to the strength requirements, start the two-way construction of the structural floor B1 of the first floor in the basement downwards and the structural floor F1 of the first floor above the ground upwards. The same position on the floor of the multi-storey structure corresponds to setting a reserved hole for excavation.
[0059] Step 2: After the structural floor F1 of the first floor above the ground is maintained until the strength meets the requirements, the suspension bracket 4 is installed at the bottom of the structural floor beam of the first floor above the ground above the reserved opening, and the suspension bracket 4 is co...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com