Construction method of fast dehydration curable type and organic synthesis type plugging agent compound plugging
A technology of organic synthesis and construction method, which is applied in the direction of chemical instruments and methods, earthwork drilling, drilling composition, etc., can solve the problems of drill sticking, pipeline blockage, easy sedimentation and accumulation at the bottom of the slurry mixing tank, etc., and achieve the guarantee Drilling tool safety, simple construction process, and the effect of saving construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0097] A leak-stopping on-site construction process suitable for compounding fast dehydration curable leak-stopping agent and organic synthetic leak-stopping agent, the steps include:
[0098] Preparatory work before construction:
[0099] 1) Prepare several recipes of drilling fluid for circulation and replacement;
[0100] 2) According to the amount of plugging slurry to be prepared, choose to clean 1 to 2 mud tanks, keep their agitators and butterfly valves in good condition, and prepare two gas pipelines;
[0101] 3) Preparation of the mud pump: It is required that the mud pump is well watered and the filter screen participating in the circulation is removed;
[0102]4) Check the power equipment and suspension system in advance to ensure normal construction;
[0103] 5) Lower the bare drill pipe used in this drilling to the casing shoe. Since the well itself is currently in the stage of lost circulation, the pump pressure and displacement during normal drilling are direc...
Embodiment 2
[0116] When this technology was applied to a well in Zigong, Sichuan, 32 to 34 parts of barite was added in the formula of step 1) in Example 1, which was added before adding the organic synthetic plugging agent, and stirred for 5 ~10 minutes; the barite powder is the barite powder described in the standard number GB / T 5005-2010. All the other are with embodiment 1.
[0117] After successful plugging, the pressure test confirmed that the equivalent density of the pressure bearing capacity of the formation was reduced from 1.62g / cm 3 Increased to 1.91g / cm 3 , reached the predetermined goal, and met the construction requirements for drilling the salt layer in the next step.
PUM
Property | Measurement | Unit |
---|---|---|
density | aaaaa | aaaaa |
density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com