A technology of overall sliding and construction technology, which is applied in the direction of building structure, construction, and building materials processing, etc., can solve problems such as extension of construction period, extension of construction period, self-heaviness of a single roof truss, etc., and achieve safe and reliable technology and shorten construction period Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] An overall sliding construction process for a large-span steel structure tire frame, comprising the following steps:
[0016] 1. Build a fastener-type steel pipe sliding and assembled tire frame, install the sliding track and propeller control system, use fastener steel pipes to tie the sliding track every 6m, and check the stability of the sliding track.
[0017] 2. The truss is hoisted in sections, hoist the hoisting member to the specified position, fix it after correction, install two trusses on the assembled tire frame as the sliding unit, install the hydraulic control system and the hydraulic operating system, and the two trusses are integrated at both ends Slide towards the middle.
[0018] 3. Debug the thruster control system. The truss sliding unit slides to the design position with the tire frame as a whole, unloads and fixes it on the structural column, corrects the position of the truss, assembles the tire frame and slides back, and prepares for the assembly...