Wind turbine generator system optimal start control method
A technology of wind power generators and wind turbines, applied in wind power generation, electrical components, circuit devices, etc., can solve problems such as increased failure rate, increased unit self-consumption and equipment fatigue loss
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] Such as figure 1 As shown, the present invention will be further described in detail below in conjunction with an example of optimal start-up control of a certain type of wind turbine in a wind farm in August 2015 during the small wind period.
[0047] 1) Select 3 units with high startup times, high power consumption and high failure rate as the test unit. Test unit numbers: D-05, E-19, F-26.
[0048] 2) Collect the wind speed data of the test unit for the first 5 days in August, and use the average wind speed every 10 minutes as a sample point, a total of 720 sample points, and use the time series analysis method to establish the AR(p) model of the wind speed sequence.
[0049] D-05 wind speed sequence model:
[0050] x(k+1)=0.548x(k)+0.169x(k-1)-0.0078x(k-2)+0.2487x(k-3)+w(k)
[0051] E-19 wind speed sequence model:
[0052] x(k+1)=0.768x(k)-0.2453x(k-1)+0.0078x(k-2)+w(k)
[0053] F-26 wind speed sequence model:
[0054] x(k+1)=0.698x(k)+0.3753x(k-1)+0.0102x(k-2...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com