Power cable quality detection method
A quality inspection method and power cable technology, applied in the direction of testing dielectric strength, etc., can solve the problems of high degree of freedom of detection means, inflow of power lines, and difficulty in unifying standards, so as to improve internal management level, complete detection coverage, and operation The effect of step specification
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] Embodiment 1: a kind of power cable quality detection method, comprises the following steps:
[0020] The first step is sample selection. Randomly select 6 cables from the same batch of production cables as the cables to be tested, and randomly intercept 5 detection sections from each cable to be tested, a total of 30 detection sections, and the length of the detection section is 10 centimeters, and in the detection section cut off from the same cable, the insulation layer is reserved for a section, and the rest only retains the cable core conductor;
[0021] The second step is the resistivity detection. The resistivity of the 24 cable core conductors that have been stripped off the insulation layer is tested using the resistivity detector in turn, and the detected resistivity is compared with the national standard, and then according to good, qualified Classify and summarize the unqualified and unqualified, and count the numbers of each group, and mark on the conductor...
Embodiment 2
[0027] Embodiment 2: a kind of power cable quality detection method, comprises the following steps:
[0028] The first step is sample selection, randomly select 10 cables from the same batch of production as the cables to be tested, and randomly intercept 5 detection sections on each cable to be tested, a total of 50 detection sections, and the length of the detection section is 15 centimeters, and in the detection section cut off from the same cable, the insulation layer is reserved for a section, and the rest only retains the cable core conductor;
[0029] The second step is the resistivity detection. The resistivity of the 40 cable core conductors that have been peeled off the insulation layer is sequentially detected by the resistivity detector, and the detected resistivity is compared with the national standard, and then according to good, qualified Classify and summarize the unqualified and unqualified, and count the numbers of each group, and mark on the conductor at th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com