In-situ expansion construction structure and construction method of extra-large cross-section tunnel with increased working face inside opening
A construction method and technology of extra-large section, applied in tunnels, tunnel lining, earthwork drilling, etc., can solve the problems of high construction period requirements and high pressure to keep the passage, and achieve the effect of improving the construction progress and shortening the construction period.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The features and application process of the present invention will be further described in detail below in conjunction with the accompanying drawings for easy understanding.
[0031] In the present invention, the in-situ expansion construction structure of the ultra-large cross-section tunnel with the inner opening increasing the working surface (such as image 3 , 4 shown), including the existing tunnel A and the first temporary steel sheath arch 31a and the second temporary steel sheath arch 31b arranged at intervals in the existing tunnel along the tunnel length direction, the first temporary steel sheath arch and the second temporary steel sheath arch Excavation of the surrounding rock in the existing tunnel between the two temporary steel arches forms a tunnel profile B with a super-large section. Primary support 41 is provided on the surface of the tunnel profile with a super-large section. System anchor 43.
[0032] Further, the above-mentioned radial system an...