Construction method for drilling pile under bad geological conditions
A technology of geological conditions and construction methods, applied in sheet pile walls, infrastructure engineering, construction, etc., can solve problems such as poor bored pile construction methods, achieve obvious hole forming effect, improve efficiency, and avoid the effect of reducing diameter
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0011] Embodiments of the present invention will be described in detail below in conjunction with examples, but those skilled in the art will understand that the following examples are only for illustrating the present invention, and should not be considered as limiting the scope of the present invention. Those who do not indicate the specific conditions in the examples are carried out according to the conventional conditions or the conditions suggested by the manufacturer. The reagents or instruments used were not indicated by the manufacturer, and they were all conventional products that could be purchased from the market.
[0012] The construction method of bored pile under the adverse geological conditions of the embodiment of the present invention is specifically described below:
[0013] A method for constructing bored piles under unfavorable geological conditions includes the following steps: drilling a construction hole in the soil layer at a predetermined pile positio...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com