[0022] Specific embodiments of the present invention are described in detail below.
[0023] The method for the stable operation of the power load of the 140-ton electric arc furnace is as follows:
[0024] a. 5 minutes after the 60-ton electric arc furnace is powered on at the third gear, the 140-ton electric arc furnace starts to be powered on at the first gear, and two-phase power is used;
[0025] b. After 4 minutes of energizing the first gear and two phases of the 140-ton electric arc furnace, start to put down the third phase, and carry out three-phase normal power-on. When the 60-ton electric arc furnace sees sparks in the third phase of the 140-ton electric arc furnace through the monitoring screen, immediately cut off the power ;
[0026] c. The 140-ton electric arc furnace continues to be energized for 4 minutes at the first gear and three-phase, and then normally shifts to the seventh gear;
[0027] d. The 140-ton electric arc furnace is energized for 4 minutes a...