Prefabricated steel frame infill wall system and construction method thereof

A steel frame and infill wall technology, which is applied to walls, building components, buildings, etc., can solve the problem that the infill wall and the steel frame cannot be deformed synergistically, so as to save masonry time and manpower input, enhance seismic performance, and reduce construction costs. cost effect

Active Publication Date: 2016-09-14
HEBEI INSTITUTE OF ARCHITECTURE AND CIVIL ENGINEERING
View PDF7 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a prefabricated steel frame infill wall system and its construction method, to solve the technical problem that the existing

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated steel frame infill wall system and construction method thereof
  • Prefabricated steel frame infill wall system and construction method thereof
  • Prefabricated steel frame infill wall system and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] see example Figure 1 to Figure 4 As shown, this prefabricated steel frame infill wall system includes steel frame columns 1, steel frame beams 2, prefabricated infill wall panels 3, steel frame gusset panels 5, infill wall gusset panels 4 and fasteners 7, flame retardant flexible Filling material 8, waterproof mortar layer 9, etc.

[0038] The steel frame gusset plate 5 is connected to the inner side of the steel frame column 1 and the steel frame beam 2 at regular intervals by means of rigid connection, see figure 1 As shown, the steel frame gusset plate 5 is located on the inner circle of the rectangular steel frame enclosed by the steel frame column 1 and the steel frame beam 2, and the distance between the adjacent steel frame gusset plates 5 is 800mm-1200mm.

[0039] On the periphery of the prefabricated infill wall panel 3, the position corresponding to the steel frame gusset plate 5 is connected with the infill wall gusset plate 4, and the infill wall gusset pl...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Lengthaaaaaaaaaa
Login to view more

Abstract

The invention provides a prefabricated steel frame infill wall system and a construction method thereof. The system comprises a rectangular steel frame which is formed by steel frame columns and steel frame beams in an enclosing mode and an infill wall infilling the steel frame; steel frame joint plates are connected to the steel frame columns and the steel frame beams on a steel frame inner ring in a uniformly spaced mode, and long circular horizontal connecting holes are formed in the steel frame joint plates. According to the prefabricated steel frame infill wall system and the construction method thereof, through design of the long circular connecting holes, relative displacement can be generated between the steel frame and the infill wall, the phenomenon that cracks are generated on the infill wall under the seismic action is effectively avoided, and the anti-seismic property of the system is guaranteed by serving as the first anti-seismic defense line; meanwhile, by adopting a complete prefabricated wallboard, the whole performance is good, construction is convenient and rapid, and the labor intensity is low. The construction method can be widely applied to steel frame infill wall construction.

Description

technical field [0001] The invention relates to the technical field of construction engineering, in particular to a filling wall system and a construction method thereof. Background technique [0002] At present, the materials of infill walls can be roughly divided into three categories: lightweight bricks, blocks and plates. Most of them are made of lightweight bricks or blocks to build infill walls. Lightweight partition boards are only used as frame infill walls for inner walls. The construction method of the building is inefficient and consumes a lot of labor. Lightweight partition panels cannot meet the overall requirements of framed infill walls. [0003] The main reason for the failure of the infill wall in the steel frame structure is that the infill wall and the steel frame cannot be deformed together under the action of the earthquake, mostly because the steel frame and the infill wall are rigidly connected, and there is no relative displacement and angle between ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04B1/19E04B2/74E04B1/38
CPCE04B1/19E04B1/38E04B2/74
Inventor 麻建锁周苗苗蔡焕琴白润山
Owner HEBEI INSTITUTE OF ARCHITECTURE AND CIVIL ENGINEERING
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products