Landfill method capable of achieving stabilizing and Hg-contained soil repairing
A soil and mineralized garbage technology, applied in the field of environmental engineering, can solve the problems of high cost, reduced alkaline curing effect, unstable curing effect, etc., and achieve the effect of stabilization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0015] 1. Lay an anti-seepage layer at the bottom, lay a perforated collection pipe on it for leachate collection, lay gravel on it for diversion of leachate, lay a layer of mineralized garbage on the gravel, with a height of 200cm, and lay 4 units on it layer; multiple leachate recharge conduits are inserted on the surface of the uppermost unit layer, on the one hand to remove landfill gas, and on the other hand to refill leachate;
[0016] 2. The laying method of the unit layer is as follows: the bottom is composed of a mixed layer composed of organic waste, sludge and gypsum, the mixing ratio is gypsum: sludge: organic waste = 2:5:15, and the laying height is 100cm; For the Hg soil layer, the laying height is 200cm; the mineralized garbage layer is laid on the upper part of the Hg-containing soil layer, and the laying height is 100cm; another layer is laid above the unit layer, and so on, laid one by one;
[0017] 3. After the collected leachate is introduced into the leach...
example 2
[0020] 1. Lay an anti-seepage layer at the bottom, lay a perforated collection pipe on it for leachate collection, lay gravel on it for diversion of leachate, lay a layer of mineralized garbage on the gravel, with a height of 150cm, and lay 7 units on it layer; multiple leachate recharge conduits are inserted on the surface of the uppermost unit layer, on the one hand to remove landfill gas, and on the other hand to refill leachate;
[0021] 2. The laying method of the unit layer is as follows: the bottom is composed of a mixed layer composed of organic waste, sludge and gypsum, the mixing ratio is gypsum: sludge: organic waste = 3:8:30, and the laying height is 100cm; For the Hg soil layer, the laying height is 200cm; the mineralized garbage layer is laid on the upper part of the Hg-containing soil layer, and the laying height is 100cm; another layer is laid above the unit layer, and so on, laid one by one;
[0022] 3. After the collected leachate is introduced into the leach...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 