BIM-based pre-assembling method for double-curved glass curtain wall

A glass curtain wall and pre-assembly technology, which is applied to the processing of walls, building materials, and building components, can solve the problems of difficult installation, low installation efficiency, and low precision of hyperbolic glass curtain walls, so as to avoid rework and improve installation efficiency , Improve the effect of installation accuracy

Active Publication Date: 2016-10-12
SHANGHAI BAOYE GRP CORP
View PDF4 Cites 40 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0009] The technical problem to be solved by the present invention is to provide a BIM-based hyperboloid glass curtain wall pre-assembly method. The BIM-based hyperboloid glass curtain wall pre-assembly method solves the problems of high difficulty in on-site installation of hyperboloid glass curtain walls, low installation efficiency and low precision. question

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] A BIM-based pre-assembly method for hyperboloid glass curtain walls, the method includes the following steps:

[0024] Step 1. Import the 2D drawings of the hyperboloid glass curtain wall into BIM software Revit, and establish the 3D model of the glass curtain wall components according to the modeling specifications. The 3D model of the glass curtain wall components includes the material, specification, size, elevation, angle, joint method, detailed construction information;

[0025] Step 2: Divide the glass curtain wall components into several units in the above-mentioned 3D model of the glass curtain wall components, export the detailed drawings of the glass curtain wall components, and number the detailed drawings of the glass curtain wall components. The detailed drawings of the glass curtain wall components include dimensions, angles, Warpage value, quantity and weight information, the factory will process and produce according to the detailed drawings of glass cur...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a BIM-based pre-assembling method for a double-curved glass curtain wall. The method includes the following steps that three-dimensional models of glass curtain wall components are established according to a modeling standard; detailed glass curtain wall component drawings are guided out and numbered, and then processing and production are carried out; three-dimensional scanning is carried out on the processed glass curtain wall components, point cloud data are obtained, and three-dimensional point cloud models are established through the point cloud data; the three-dimensional point cloud models and the three-dimensional models are compared to obtain deviation values of glass curtain wall component solid bodies, and glass curtain wall component information is adjusted till the deviation values meet glass curtain wall standard requirements; and overall pre-assembling of the three-dimensional point cloud models meeting the requirements is simulated in Revit, accumulative errors in the assembling process are eliminated till the pre-assembled three-dimensional point cloud models are completely matched with the three-dimensional models, and then the glass curtain wall components are delivered out of a factory and delivered to a construction site for solid component installation. By means of the method, the problems that the double-curved glass curtain wall is large in field installation difficulty, low in installation efficiency and low in precision are solved.

Description

technical field [0001] The invention relates to a method for pre-assembling a glass curtain wall, in particular to a method for pre-assembling a hyperboloid glass curtain wall based on BIM. Background technique [0002] Glass curtain walls are divided into frame-supported glass curtain walls, point-supported glass curtain walls, and unitized glass curtain walls. [0003] Frame-supported glass curtain wall is a glass curtain wall supported by a metal frame around the glass panel. [0004] The point support glass curtain wall is a glass curtain wall composed of glass panels, point support devices and support structures. Its support structure forms include glass rib support, single steel or steel pipe support, truss support and tension rod cable system support structure. [0005] Unitized curtain wall refers to the building curtain wall that is made of various wall surfaces and supporting frames in the factory to form a complete basic unit of curtain wall structure, and is di...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04B2/88E04G21/14
CPCE04B2/88E04B2/885E04G21/14
Inventor 靳亚北李盛张海堂韩磊刘广业
Owner SHANGHAI BAOYE GRP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products