High-pier long-cantilever cast-in-situ cover beam combined-type formwork system and construction method
A construction method and long cantilever technology, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of unsatisfactory construction, slow construction speed, long construction period, etc., and achieve the effect of fast and flexible drainage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] In this embodiment, the steel structure welding process, bolt connection construction process, formwork setting process, etc. will not be repeated in this embodiment, and the embodiment of the structure related to the present invention will be focused on.
[0026] High pier long cantilever cast-in-place cover beam composite formwork system, including: cap 1, inverted groove steel plate 2, vibration isolation sheet 3, rubber plug 4, pier 5, cover beam 6, limit plate 7, anchor bolt 8 , Middle support column foot locking screw 9, Middle support column 10, Transverse connecting rod 11, Inter-column support 12, Hinge shaft 13, Center inclined strut 14, Protective net 15, Bailey beam 16, Backing plate 17, Jack 18. Short pole 19, adjustable jacking 20, cover beam bottom template 21, side support column 22, prefabricated strip foundation 23, embedded threaded sleeve 24, side support column foot locking screw 25, pole 26 , fastening bolts 27, prefabricated concrete drainage ditc...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 