Pile foundation pile head concrete pre-stripping assembly and construction method

A concrete and pre-stripping technology, which is used in infrastructure engineering, sheet pile walls, buildings, etc., can solve the problems of the difficulty of breaking the main reinforcement of the pile foundation, the complex pre-embedded structure of the cross-sectional structure, and the high technical requirements of construction, so as to facilitate the later stage of the pile. The effect of foundation detection and subsequent construction, simple structure and low cost

Inactive Publication Date: 2016-11-16
北京城建七建设工程有限公司
View PDF6 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a pile foundation pile head concrete pre-stripping component and construction method, which solves the difficulty of breaking due to the large number of main reinforcements of the pile foundation and the tight grip between the threaded steel bars and the concrete, and the complicated pre-embedded structure of the current cross-section structure. , High technical requirements for construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pile foundation pile head concrete pre-stripping assembly and construction method
  • Pile foundation pile head concrete pre-stripping assembly and construction method
  • Pile foundation pile head concrete pre-stripping assembly and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0043] Hereinafter, an embodiment of a pile foundation pile head concrete pre-stripping assembly and construction method of the present invention will be described with reference to the accompanying drawings.

[0044] The examples described here are specific specific implementations of the present invention, and are used to illustrate the concept of the present invention. They are all explanatory and exemplary, and should not be construed as limiting the implementation of the present invention and the scope of the present invention. In addition to the embodiments described here, those skilled in the art can also adopt other obvious technical solutions based on the claims of the application and the contents disclosed in the description, and these technical solutions include adopting any obvious changes made to the embodiments described here. Replacement and modified technical solutions.

[0045] The accompanying drawings in this specification are schematic diagrams, which assis...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Diameteraaaaaaaaaa
Diameteraaaaaaaaaa
Diameteraaaaaaaaaa
Login to View More

Abstract

The invention provides a pile foundation pile head concrete pre-stripping assembly and a construction method. The assembly comprises a pre-embedded isolation component, a pre-embedded splitting component, splitting equipment and hoisting equipment. The pre-embedded isolation component comprises main reinforcement sleeves and acoustic testing pipe sleeves. The preembedded splitting component comprises a set of horizontal splitting pipes pre-embedded on a fracture surface. The splitting equipment comprises hydraulic splitting machines. The hydraulic splitting machines are inserted into the horizontal splitting pipes from the two sides to conduct splitting to form the fracture surface during breaking and stripping. The hoisting equipment comprises a lifting tool, a lifting hook and a steel wire rope. The steel wire rope penetrates through the split and broken horizontal splitting pipes and is connected with the lifting hook, so that pile head concrete is stripped off from reinforcements and acoustic testing pipes. The pile foundation pile head concrete pre-stripping assembly can be made of engineering leftover materials and is low in cost. During construction, the fracture surface is formed through the hydraulic splitting machines, and then the pile head concrete can be broken and stripped off. The process can be completed only by one person. The hydraulic splitting machines can provide smooth pile head connecting surfaces to facilitate later pile foundation detection and follow-up construction. The pile foundation pile head concrete pre-stripping assembly is easy to operate, low in technical requirement, good in breaking and stripping effect and high in efficiency.

Description

technical field [0001] The invention relates to the technical field of pile head removal, in particular to a pile foundation pile head concrete pre-stripping component and a construction method. Background technique [0002] At present, in the construction of cast-in-situ piles, because the strength of the uppermost part of the concrete is poor, in order to ensure the strength of the overall pile body concrete, a part is exceeded when pouring concrete, and then the pile head is broken to remove the excess part. When the pile head concrete is chiseled out, manual construction is generally used. The tools are jackhammers, sledgehammers and steel drills. The head is cut off horizontally, and the concrete pile head is broken. At least two people are required to cooperate in the construction, which is inefficient and poses a high safety risk. Secondly, no matter whether hammering or pick is used to break, due to the large number of main reinforcements and the tight grip with the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D9/00
CPCE02D9/005
Inventor 海占权李广华王南昌杨帆吕豪梁新利张敏
Owner 北京城建七建设工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products