Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Control method and device for station train running operation

A control device and train technology, which is applied in the control system of the transportation center, transportation and packaging, railway car body parts, etc., can solve the problems of not being able to fully adapt to station traffic operations, traffic safety interference, car crashes and fatalities, etc.

Active Publication Date: 2016-12-14
中国铁路兰州局集团有限公司 +1
View PDF9 Cites 41 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

6502 Centralized electrical equipment and computer interlocking equipment can ensure the correctness of the interlocking relationship between signals, track circuits, and turnouts, but cannot guarantee that the train route is safe for receiving and dispatching various types of trains. The route of the overrun train to realize the receiving and dispatching of the overrunning train will cause the train accident of receiving and dispatching the car crash
This patent mainly considers the applications and instructions for receiving and departing trains at adjacent stations, the state of track occupancy, selects the track according to the attributes of the train, and sends the advance notice information to the train, but it cannot prevent the wrong track selection, and cannot prevent the wrong condition. The application and instructions for receiving and departing trains are given below, and it is impossible to prevent train routing errors and cannot fully adapt to station traffic operations. At the same time, traffic safety still requires human intervention.
[0006] Chinese invention patent applications 2010102327819 and 2011800018743 also disclose similar technical solutions, but none of these technical contents can effectively solve the problems existing in the prior art
[0007] In addition, there is still a common problem in the existing technology, that is, it is impossible to effectively control and avoid the occurrence of train route mishandling events. It is precisely for this reason that the safety work of receiving and dispatching trains at this stage mainly depends on the strict execution of operations by operators. Standards and operating discipline to ensure, for example, requirements: operating personnel are familiar with the operation plan, strengthen the shift management of key trains, operating terms for receiving and departing trains, fill in the busy line book, strengthen the organization of construction skylight repair operations, etc. to carry out manual card control
However, with the rapid development of railways, the emergence of new situations such as fast train speed, high traffic density, short tracking intervals, complex operating conditions, and multiple connection directions have put forward higher and higher requirements for train operation safety. The traditional operation method of personnel self-control and mutual control can no longer guarantee the safe operation of high-speed and high-density trains

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Control method and device for station train running operation
  • Control method and device for station train running operation
  • Control method and device for station train running operation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0090] The present invention is explained in detail below in conjunction with the examples, and the following content is only for illustrating the present invention, rather than limiting the protection scope of the present invention.

[0091] attached figure 1 It is an embodiment of the device of the present invention, including train dispatching command system / dispatching centralized control (TDCS / CTC) planning module, TDCS / CTC central database module, transportation dispatching management system (TDMS) plan in this embodiment of the present invention Module, computer interlocking module and outdoor signal equipment, the device also includes: station plan management module, dispatch command management module, operation process management and control module, route establishment condition card control module, basic data management module and station basic data module. The composition of each module among the present invention, mutual connection relation and corresponding funct...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a control method and device for station train running operation during the railway transportation. The control method for station train running operation is characterized in that the current station site lines, equipment and train running static basic data is used as train route inherent card control principles and conditions; through the train plan planning, dispatching command processing and flow process operation setting, the train card control conditions are enriched and refined; the route integral card control condition of each train is formed; in addition, one-by-one checking and rechecking are performed on various card control conditions before the train route building; route handling is performed after the errorless condition is confirmed. The control device for station train running operation provided by the invention comprises a plurality of function modules; the method provided by the invention is realized through each functional module; the timeliness and the comprehensiveness of the card control condition inspection are ensured; the correctness of the route building is ensured; the occurrence of wrong route handling problem is fundamentally avoided.

Description

Technical field [0001] The invention relates to a control method and device for station train entry and exit operation in railway transportation. Background technique [0002] Station train operation, that is, receiving and dispatching trains is one of the most important work links in the production of railway transportation. It is directly related to the safety of train operation and transportation efficiency, and is the basis for ensuring the safety, smoothness and efficiency of railway transportation. The traditional method is to rely on the artificial control of the operator, but due to the influence of the operator's own physiological and psychological factors, it is easy to cause misjudgment or misoperation. To solve this problem, various technical and institutional means have been adopted at the current stage. [0003] In the prior art, at the TDCS station, the train route prepared for receiving and dispatching trains is completed manually (station signalman), and the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): B61L27/00
CPCB61L27/10
Inventor 王峰邢涛朱生宪黄磊苗永水何敏刚贺涛杨海东王强赵伟崔虎王铁峰杨英任小东曹吉祥王兴利宋哲超刘育荣马福龙汤宝伟陈宣张杰
Owner 中国铁路兰州局集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products