Calculation Method of Original Oil Saturation in Water-flooded Formation of Coring Wells in Extra-high Water-cut Period
A technology of ultra-high water cut period and calculation method, which is applied in the field of original oil saturation calculation of water-flooded layers of coring wells in ultra-high water cut period, and can solve the problems of large calculation errors and the like
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] In order to make the above and other objects, features and advantages of the present invention more comprehensible, the preferred embodiments are listed below and shown in the accompanying drawings in detail as follows.
[0030] Such as figure 1 as shown, figure 1 It is a flow chart of the method for calculating the original oil saturation of the water-flooded layer of the coring well during the extra-high water-cut period of the present invention.
[0031] Step 101, investigate the structure of the reservoir and the geological conditions of the reservoir, collect the effective porosity of the oil layer in the coring well in the original state, and the original oil saturation data for coring analysis.
[0032] Step 102, based on the oil-water saturation data of conventional analysis of rock samples, first correct the pore volume expansion according to the porosity measurement data under overburden pressure, and at the same time, correct the oil-water depressurization a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com