Embodiment 1
[0021] According to the specifications of 400mm×400mm×50mm foamed cement board, the steel mold is made, and the inner space size is 402mm×422mm×55mm. Prepare M20 colored decorative mortar, carry out molding, demoulding and maintenance according to the above-mentioned preparation process (3) to (5) steps, after the decorative mortar layer is condensed and hardened, apply surface protective agent.
[0022] Dry-hanging construction: Install fixed ring expansion screws on the base of the wall, and hang the galvanized hook of the integrated foam cement board with thermal insulation and decoration into the ring. Then fill the reserved cavity of 20 mm without pouring decorative mortar with thermal insulation mortar (the purpose of reserving the cavity for secondary filling is to prevent the occurrence of cold and heat bridges), and finally fill the gaps with caulking agent to complete the construction.
Embodiment 2
[0024] According to the specifications of 600mm×600mm×50mm foamed cement board, the steel mold is made, and the inner space size is 602mm×622mm×55mm. Prepare M25 white decorative mortar, carry out molding, demoulding and maintenance according to the above-mentioned preparation process (3) to (5) steps, after the decorative mortar layer is condensed and hardened, apply surface protective agent.
[0025] Dry-hanging construction: Install fixed ring expansion screws on the base of the wall, and hang the galvanized hook of the integrated foam cement board with thermal insulation and decoration into the ring. Then fill polyurethane in the reserved 20 mm cavity of unpoured decorative mortar (the purpose of reserving the cavity for secondary filling is to prevent cold and heat bridges), and finally fill the board joints with caulk to complete the construction.
Embodiment 3
[0027] According to the specifications of 500mm×500mm×50mm foamed cement board, the steel mold is made, and the inner space size is 502mm×522mm×55mm. Prepare M20 white decorative mortar, carry out molding, demoulding and curing according to the above-mentioned steps (3) to (5) of the preparation process, and apply the surface protective agent after the decorative mortar layer is condensed and hardened.
[0028] Dry-hanging construction: Install fixed ring expansion screws on the base of the wall, and hang the galvanized hook of the integrated foam cement board with thermal insulation and decoration into the ring. Then fill polyurethane in the reserved 20mm cavity of unpoured decorative mortar (the purpose of reserving the cavity for secondary filling is to prevent cold and thermal bridges), and finally fill the board joints with caulking agent to complete the construction.