Assembly type building construction full process data cooperation management system based on BIM

A data collaboration and management system technology, applied in data processing applications, instruments, logistics, etc., can solve problems such as unobjectiveness, information distortion management decision-making, and the system cannot realize information sharing and interaction, so as to improve production efficiency, improve efficiency and The effect of accuracy

Inactive Publication Date: 2017-04-26
CHINA CONSTR SCI & TECH CO LTD
View PDF2 Cites 73 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, at present, prefabricated buildings often use independent information management systems in each link of design, component processing, and on-site assembly, and information sharing and interaction cannot be realized bet...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Assembly type building construction full process data cooperation management system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.

[0024] Such as figure 1 As shown, the present invention provides a BIM-based prefabricated building construction process data collaborative management system, including:

[0025] BIM (Building Information Modeling, building information model) data processing subsystem, which is used to store the prefabricated building BIM model that can be split into multiple component models in a database, and assign unique coding information to each component model, At the same time, each component model is also associated with attribute information, and the attribute information includes geometric information and material information of the component model;

[0026] The production management subsystem is used to obtain the geometric information and material information of each component m...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an assembly type building construction full process data cooperation management system based on BIM. The system comprises a BIM data processing subsystem, the BIM data processing subsystem is used for storing an assembly type building BIM model capable of being disassembled into multiple component models into a database, the unique code information is provided for each component model, each component model is associated with the attribute information, including the geometric information and the material information; a production management subsystem, the production management subsystem is used for acquiring the geometric information and the material information of each component model to make production equipment produce corresponding components; and a tracking subsystem, identity label generation equipment is used for generating a unique identity label according to the code information of each component model, multiple pieces of code information identification equipment are distributed at multiple nodes of production, storage, transportation and assembly links, and the tracking subsystem is used for updating the state information of the component models. The system is advantaged in that assembly type building construction full process cooperation management is realized, and assembly type building production efficiency is improved.

Description

technical field [0001] The invention belongs to building construction technology, in particular to a BIM-based data collaborative management system for the whole process of prefabricated building construction. Background technique [0002] Prefabricated buildings refer to buildings assembled on site with prefabricated components. Its main features are standardization of design, factory production, mechanization of construction, integration of mechanical and electrical decoration, and informationization of management. With the development of modern industrial technology, building houses can be manufactured in batches and complete sets like machine production. As long as the prefabricated building components are transported to the construction site and assembled, the advantage of this kind of building is that it can be built quickly, is less restricted by weather conditions, saves labor and can improve the quality of the building. [0003] However, at present, in the design, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10G06Q50/08G06Q10/08
CPCG06Q10/101G06Q10/087G06Q50/08
Inventor 叶浩文周冲张希忠韩超黄臣王明清
Owner CHINA CONSTR SCI & TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products