A deep covering layer and fast technology, applied in construction, infrastructure engineering and other directions, can solve the problems of low work efficiency and high accident rate, and achieve the effect of improving construction work efficiency, improving hole-forming work efficiency, and reducing the accident rate in the hole.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0025] A deep muddy semi-cemented sand-pebble gravel layer was deposited in the ancient river channel on the left bank of a water conservancy project. Curtain grouting was designed for anti-seepage treatment, and the maximum curtain design depth was 180m. In the early stage of the grouting test, the grouting test was carried out by using the orifice closed grouting method and the casing valve grouting method. Since some formations are highly permeable formations, in-hole accidents such as drill sticking and casting pipes are prone to occur during drilling and grouting tests, which have a certain impact on the grouting tests.
[0026] Adopt the step of the inventive method as follows:
[0027] Step 1: Turn on the pipe drilling rig, use a drill pipe with a diameter of 89 mm and a casing wall with a diameter of 146 mm for drilling, and drill to the maximum depth that the pipe drilling machine can drill;
[0028] Step 2: Change to a pressure roller bit with a diameter of 115 mm a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com