Construction method of super high-rise building reinforced layer steel structure outrigger truss

A technology of outrigger truss and construction method, which is applied to building components, building structures, buildings, etc., can solve the problems of large construction difficulty, heavy rigid arm structure, complicated process, etc., and achieves easy maintenance, simple structure, and convenient use. Effect

Active Publication Date: 2017-05-10
CHINA CONSTR EIGHTH ENG DIV
View PDF5 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In recent years, in the design of super high-rise buildings, more rigid arms have been used to improve the thrust resistance of the frame core tube system. However, the general rigid arm structure is heavy and complex, and it is difficult to construct.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0044] The construction method of the steel structure outrigger truss of the reinforced layer of the super high-rise building of the present invention will be described in detail below.

[0045] The construction process of the construction method of the steel structure outrigger truss of the super high-rise building reinforcement layer of the present invention is: construction preparation → outrigger truss processing and pre-assembly → outrigger truss lower chord installation → floor concrete pouring → outrigger truss upper chord installation → Web member installation → wall column reinforcement binding → wall column formwork support → beam slab formwork support, steel bar binding → beam slab column concrete pouring → stress monitoring and analysis → post-welding of the web → painting topcoat and fireproof paint.

[0046] A. Outrigger truss processing and pre-assembly

[0047] 1. The processing of steel components is carried out in the factory. The raw materials used for steel...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Particle sizeaaaaaaaaaa
Login to View More

Abstract

The invention provides a construction method of a super high-rise building reinforced layer steel structure outrigger truss, belonging to the technical field of construction engineering. The method comprises the steps of construction preparation, outrigger truss processing and pre-assembly, outrigger truss lower chord member installation, floor concrete pouring, outrigger truss upper chord installation, web member installation, wall column steel bar binding, wall column formwork erection, beam plate formwork erection and steel bar binding, beam plate column concrete pouring, stress monitoring and analysis, web member post-welding, finishing coat and fire-proof paint brushing. According to the construction method of the super high-rise building reinforced layer steel structure outrigger truss, the whole truss is decomposed into parts and components which can be hoisted by field lifting equipment by utilizing the connection relationship of all rod pieces of the outrigger truss, so that integral hoisting is changed into high altitude bulk, the difficulty that the outrigger truss needs to be lifted by a large crane is overcome, and the construction is better in flexibility and operability.

Description

technical field [0001] The invention relates to the technical field of construction engineering, in particular to a construction method for a steel structure outrigger truss of a reinforced layer of a super high-rise building. Background technique [0002] In recent years, in the design of super high-rise buildings, rigid jibs have been widely used to improve the thrust resistance of the frame core tube system, but generally the rigid jib structures are heavy and complex in technology, making construction difficult. Contents of the invention [0003] The technical task of the present invention is to solve the deficiencies of the prior art, and provide a construction method for the steel structure outrigger truss of the reinforcement layer of super high-rise buildings. [0004] Use software-assisted drawing technology to stake out the nodes of the outrigger truss, and divide the entire steel truss into units that can be directly hoisted by on-site hoisting machinery such as...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04C3/04E04G21/00
CPCE04C3/04E04C2003/0413E04G21/00
Inventor 马海龙刘海勇
Owner CHINA CONSTR EIGHTH ENG DIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products