An upper and lower split prefabricated pipe gallery and its installation method
An installation method and technology for prefabricating pipes, which can be applied to underwater structures, buildings, artificial islands, etc., and can solve the problems of honeycomb defects in the bottom plate of pipe gallery, mold expansion, and abrasive tools that are easy to wear.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The present invention will be further described below in conjunction with the accompanying drawings.
[0033] Such as figure 1 and 2 As shown, an upper and lower split prefabricated pipe gallery includes an upper pipe gallery 1 and a lower pipe gallery 2; the upper pipe gallery 1 includes a top plate 11 and two upper side panels 12; the lower pipe gallery 2 includes a bottom plate 21 and two lower sides Plate 22; the two upper side plates 12 are connected with the two lower side plates 22, and the interior is empty.
[0034] The lower side plate 22 of the lower pipe gallery 2 is pre-embedded with a plurality of lower PC steel rods 3 with anchor plates and nuts at the bottom, and the upper side plate 12 of the upper pipe gallery 1 is provided with a plurality of lower PC steel bars 3 with the lower side plate 22. The through hole 13 corresponding to the rod 3, the upper PC steel rod 4 is pierced in the through hole 13; the lower PC steel rod 3 and the upper PC steel ro...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

