Method and structure for simultaneous conducting of waterproof construction on post-cast strip and main body structure
A technology of main structure and post-casting belt, applied in infrastructure engineering, hydraulic engineering, underwater structures, etc., can solve problems such as delay in construction period and economic loss, and achieve the effect of ensuring construction period, low cost, and convenient and fast construction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0030] This example figure 1 As shown, in order to make it easier to see the structure of the post-pouring belt, the waterproof layer and the leveling layer are partially sectioned, and only a part of the backfill soil is drawn schematically. During specific implementation, the main structure 1 is constructed first, and a post-casting belt 2 with a width of 800 mm is reserved between the main structures 1 . After the construction of the main structure 1 is completed, the sealing steel plate 3 is pasted on the main structure 1 on both sides of the post-casting tape 2 with epoxy structural glue 8 . The thickness of the sealing steel plate 3 is 50mm, and it is advisable that each side of the sealing steel plate 3 exceeds the side line of the post-casting tape 2 by 200mm. There should be no gap between 1; after the sealing steel plate 3 is pasted, a layer of steel wire mesh 4 is laid on the outer surface of the sealing steel plate 3. Cracks are formed between the concrete mix...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 