Reinforcing method of machining workshop
A kind of factory building, the same technology, applied in the field of reinforcement of machining factory buildings, can solve the problems of not being able to guarantee the stability of the brick wall itself, not being able to guarantee the quality of the brick wall reinforcement, and not being able to save the construction period, etc., to save the cost of manual cleaning , Save the cost of reinforcement, and the reinforcement site is clean and tidy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] Such as figure 1 , figure 2 As shown, in this embodiment, two frame columns 1 parallel to each other are preferably used. The frame columns 1 are preferably perpendicular to the ground, and the stability is higher during use. The brick wall 2 is arranged between the frame columns 1. The protective strips are divided into two groups, and are arranged symmetrically along the central connection line between the frame columns 1. The brick wall 2 is arranged between the two sets of protective strips, and the protective strips of the same height in each group of protective strips are arranged There are several groups of tensioning devices, the ends of each group of tensioning devices respectively pass through the protective belt at the same height, and the tensioning devices pass through the brick wall 2, effectively ensuring the integrity and safety of the brick wall.
Embodiment 2
[0022] Such as figure 1 , figure 2 As shown, on the basis of Example 1, the frame column 1 is vertically provided with angle steel 3 on the plane of the side of the brick wall, the center line of the angle steel 3 is perpendicular to the center connection line between the frame columns 1, and the The outer wall is in contact with the wall of the adjacent frame column 1, the angle steel 3 is provided with an anchor bolt 4, the anchor bolt 4 passes through the angle steel 3 and is arranged in the frame column 1, the end of the protective belt and the corresponding angle steel 3 are parallel to the brick wall and The inner wall on the side away from the brick wall is welded and fixed. After the vertical angle steel, steel strip, and pull screw are set and welded and fastened, the part of the brick wall adjacent to the frame column can be chiseled and the frame column can be reinforced.
Embodiment 3
[0024] Such as figure 1 , figure 2 As shown, on the basis of the above-mentioned embodiment, the tensioning device is a pull screw 6, and the pull screw 6 passes through the protective belt at the same height, and the pull screw 6 is fitted with a nut 7, and the protective belt is arranged on the nut 7. Between the outer surface of the brick wall, and the nut 7 is in contact with the outer wall of the protective belt. As a tensioning and fixing device commonly used in construction, the opposite pull screw 6 is low in cost, easy to assemble and disassemble, can be reused, and reduces the cost of use.