Geotechnical engineering investigation method for linear project

A technology of geotechnical engineering and engineering, applied in the field of rapid survey of geotechnical engineering, can solve the problems of limited measurement accuracy of instruments and rough results, and achieve the effects of high work efficiency, simple steps and wide application prospects.

Inactive Publication Date: 2017-06-27
TIANJIN NORTH CHINA ENG INVESTIGATION & DESIGN CO LTD
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] In short, there are three types of existing geotechnical engineering exploration methods. Among them, pit exploration and drilling are direct methods, which are in the form of "point" surveys, and the results are clear. Engineering geophysical prospecting is an indirect method, which is affected by environmental factors and the limitation of instrument measurement accuracy. , the result is roughly

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] The invention provides a geotechnical engineering survey method for linear engineering, which has simple steps, high survey accuracy and high work efficiency.

[0021] A geotechnical engineering investigation method for linear engineering, comprising the following steps:

[0022] 1) Divide the geotechnical survey area into several working sections along the project direction;

[0023] 2) Carry out horizontal directional drilling in the measured area of ​​each working section to form two tunnels. The plane formed by these two tunnels is parallel to the ground. A tunnel is laid on the end surface of the ground. Finally, an equilateral triangle is formed, and a pipeline along the project direction is arranged in the formed tunnel for the engineering geophysical detector and receiver to pass through;

[0024] 3) Place the engineering geophysical probe in one of the pipelines, put the receiver in the other pipeline, and move the engineering geophysical probe and the receive...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a geotechnical engineering survey method for linear engineering, which comprises the following steps: 1) dividing the geotechnical survey area into several working sections along the project direction; 2) performing horizontal orientation on the measured area of ​​each working section Drill holes to form two tunnels. The plane formed by these two tunnels is parallel to the ground. A channel is laid on the upper surface of the ground. Pipelines that can be passed through by engineering geophysical detectors and receivers along the project direction; 3) place engineering geophysical detectors in one of the pipelines, and put receivers in the other pipeline, and place the engineering geophysical detectors and receivers through the same pipe. One end moves to the other end, so as to detect and obtain the geotechnical survey data of each area; 4) The engineering geophysical prospecting instrument and the receiving instrument are interchanged into different pipelines, and multiple sets of data are measured, collected and calculated.

Description

technical field [0001] The invention relates to the technical field of geotechnical survey, and more specifically, relates to a quick geotechnical survey method. Background technique [0002] Any civil engineering is closely related to rock and soil, they directly contact and interact with the rock and soil medium. Therefore, it is an important prerequisite for engineering design and construction to fully understand and understand the distribution characteristics of rock and soil mass and engineering properties. Exploration is the main means to reveal the spatial distribution of rock and soil (including the distribution of groundwater closely related to rock and soil) and its changes. [0003] The forms of various civil engineering foundations are different, some are in the shape of "points" and some are in the shape of "lines". In a typical building such as a frame structure, the structural columns disperse the gravity of the house to the foundation at a relatively indepe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G01V3/00G01V1/00G01V7/00G01V5/00
CPCG01V3/00G01V1/00G01V5/00G01V7/00
Inventor 王凡俊
Owner TIANJIN NORTH CHINA ENG INVESTIGATION & DESIGN CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products