Quick leakage repairing method for anticorrosive pipeline
A pipeline and leak-trapping technology, applied in the direction of pipe components, pipes/pipe joints/fittings, mechanical equipment, etc., can solve the problems of increased maintenance frequency, disrupted production rhythm, short validity period, etc., to achieve good integration, prolong service life, patching fast effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0022] A method for quickly repairing leaks in anti-corrosion pipelines described in this embodiment comprises the following steps:
[0023] (1) Clean the inside of the pipeline, find the leak point, and dig the anti-corrosion layer near the leak point into a round hole with the leak point as the center. After exposing the inner wall of the pipe, clean and remove rust. The area of the round hole is 4cm 2 ;
[0024] (2) Drill 5 small holes on the inner wall of the exposed pipe, the 5 small holes are arranged in a cross shape, the middle one is a through hole, and the other 4 are blind holes of 4mm, and tap the thread in the blind hole;
[0025] (3) PFA resin strips are arranged in blind holes;
[0026] (4) Prepare raw materials for repairing. The raw materials are mixed with ABS powder and PFA powder, of which ABS powder accounts for 74% by weight, and the raw materials are heated to 240°C to become semi-thick;
[0027] (5) Use a gun to preheat the pipe near the through hol...
Embodiment 2
[0034] A method for quickly repairing leaks in anti-corrosion pipelines described in this embodiment comprises the following steps:
[0035] (1) Clean the inside of the pipeline, find the leak point, and dig the anti-corrosion layer near the leak point into a round hole with the leak point as the center, and then clean and remove the rust after exposing the inner wall of the pipe. The area of the round hole is 10cm 2 ;
[0036] (2) Drill 5 small holes on the inner wall of the exposed pipe, and the 5 small holes are arranged in a cross shape, the middle of which is a through hole, and the remaining 4 are 5mm blind holes, and tap in the blind holes;
[0037] (3) PFA resin strips are arranged in blind holes;
[0038] (4) Prepare raw materials for repairing. The raw materials are mixed with ABS powder and PFA powder, of which ABS powder accounts for 70% by weight, and the raw materials are heated to 250°C to become semi-thick;
[0039] (5) Use a gun to preheat the pipe near th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com