Drilled grouting pile composite roadbed structure and construction method thereof

A technology for bored piles and composite roadbeds, which is applied in basic structural engineering, roads, buildings, etc., can solve problems such as low bearing capacity, overall or local settlement, etc., and achieve the effects of small construction vibration, improved efficiency, and reduced noise.

Inactive Publication Date: 2017-07-21
CHINA RAILWAY 19 BUREAU GRP CO LTD
View PDF8 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a composite roadbed structure of bored piles and its construction method to solve the problems of the existing roadbed in the prior art that are prone to overall or local settlement and low bearing capacity

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Drilled grouting pile composite roadbed structure and construction method thereof
  • Drilled grouting pile composite roadbed structure and construction method thereof
  • Drilled grouting pile composite roadbed structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0028] In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connected, or integrally connected; it can be mechanically connected or electrically connected; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.

[0029] Such as figure ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of roadbed reinforcement, and discloses a composite roadbed structure of bored piles and a construction method thereof. A borehole in the rock formation; a reinforcement body disposed in the borehole; a cushion structure disposed on the upper surface of the reinforcement body; and a filling roadbed disposed on the upper surface of the cushion structure, the method comprising : rolling the basic body of the road; carrying out the drilling operation on the road basic body after rolling; pumping concrete into the borehole; lowering the reinforcement cage into the borehole poured with concrete; laying the cushion structure; on the cushion structure Rolling and laying to fill the roadbed. The bored pile composite subgrade structure has the advantages of preventing post-construction settlement and improving bearing capacity.

Description

technical field [0001] The invention relates to the technical field of roadbed reinforcement, in particular to a composite roadbed structure of bored piles and a construction method thereof. Background technique [0002] For the existing subgrades of railways, municipal roads, wharves and reservoirs, due to the limitations of technical and economic conditions during construction, there are often cases of low filling and compaction standards. After the road or railway is put into operation, the long-term Under vibration or rolling, the existing roadbed is prone to overall or partial settlement and low bearing capacity. Contents of the invention [0003] (1) Technical problems to be solved [0004] The object of the present invention is to provide a composite roadbed structure of bored piles and its construction method, so as to solve the problems of the existing roadbed in the prior art that are prone to overall or local settlement and low bearing capacity. [0005] (2) T...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01C3/00E02D27/12E02D5/34
CPCE01C3/00E02D5/34E02D27/12
Inventor 宋立柱
Owner CHINA RAILWAY 19 BUREAU GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products