A rockfill dam face deformation monitoring device and construction method
A deformation monitoring and construction method technology, applied in measuring devices, instruments, etc., to achieve the effect of improving service life, strong adaptability, and continuous observation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] like figure 1As shown, there is a concrete panel 2 on the upstream side of the rockfill dam 1 of the present invention, and there are multiple sections of stainless steel pipes 3 inside the concrete panel 2. The pipes of the stainless steel pipes 3 are threadedly connected, and the joints are waterproof and sealed. , the stainless steel pipe 3 is connected to form an integral hollow pipe, and the stainless steel pipe 3 is welded and fixed on the steel bar of the panel 2 by means of a pipe clamp 5 . There is an array type three-dimensional measurement system 6 inside the stainless steel pipe 3, and the array type three-dimensional measurement system 6 penetrates into the PVC pipe before being put into the stainless steel pipe 3, and the array type three-dimensional measurement system 6 and the stainless steel pipe The gaps between 3 are filled with fine sand 4, and the fine sand 4 is filled to the top of the stainless steel pipe 3 and then stops, the array type three-dim...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com