[0038](1) A plurality of tire frames 2 are arranged in parallel at equal intervals front and back, and each tire frame 2 includes a bow-shaped frame body 2-1, between the arc-shaped frame and the horizontal frame of the arc-shaped frame body 2-1 A plurality of support columns 2-2 are fixed at intervals along the vertical direction left and right, and transverse connections 2-3 are used between the support columns 2-2 for reinforcement.
[0039] (2) Fix the prefabricated steel cylinder segment structure 1 on the tire frame 2, so that the tire frame 2 and the steel cylinder segment structure 1 are firmly connected to form a whole;
[0040] (3) Locate and set out the wires on the left or right side of the steel cylinder piece structure 1, and draw the position line of the tongue and groove structure 3 on the surface of the steel cylinder piece structure 1 to facilitate subsequent processing and positioning.
[0041] (4) Install the tongue-and-groove structure 3 according to the p...
Embodiment 2
[0046] (1) A plurality of tire frames 2 are arranged in parallel at equal intervals front and back, and each tire frame 2 includes a bow-shaped frame body 2-1, between the arc-shaped frame and the horizontal frame of the arc-shaped frame body 2-1 A plurality of support columns 2-2 are fixed at intervals along the vertical direction left and right, and transverse connections 2-3 are used between the support columns 2-2 for reinforcement.
[0047] (2) Fix the prefabricated steel cylinder segment structure 1 on the tire frame 2, so that the tire frame 2 and the steel cylinder segment structure 1 are firmly connected to form a whole;
[0048] (3) Locate and set out the wires on the left or right side of the steel cylinder piece structure 1, and draw the position line of the tongue and groove structure 3 on the surface of the steel cylinder piece structure 1 to facilitate subsequent processing and positioning.
[0049] (4) Install the tongue-and-groove structure 3 according to the ...
Embodiment 3
[0054] (1) A plurality of tire frames 2 are arranged in parallel at equal intervals front and back, and each tire frame 2 includes a bow-shaped frame body 2-1, between the arc-shaped frame and the horizontal frame of the arc-shaped frame body 2-1 A plurality of support columns 2-2 are fixed at intervals along the vertical direction left and right, and transverse connections 2-3 are used between the support columns 2-2 for reinforcement.
[0055] (2) Fix the prefabricated steel cylinder segment structure 1 on the tire frame 2, so that the tire frame 2 and the steel cylinder segment structure 1 are firmly connected to form a whole;
[0056] (3) Locate and set out the wires on the left or right side of the steel cylinder piece structure 1, and draw the position line of the tongue and groove structure 3 on the surface of the steel cylinder piece structure 1 to facilitate subsequent processing and positioning.
[0057] (4) Install the tongue-and-groove structure 3 according to the ...