Method for topping and entry remaining of tunneling-along-top ultrahigh mining roadway for inclined thick coal seam
A technology of inclined thick coal seam and mining roadway, which is applied in the direction of mining equipment, earthwork drilling, mine roof support, etc., can solve the problems of coal loss at the end of the working face, increased loss of coal resources, and gas accumulation at the upper corner, etc. Achieve the effects of increasing recovery rate, good economic and social benefits, and improving recovery rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] The specific implementation of the present invention will be described in detail below in conjunction with the accompanying drawings and specific conditions.
[0016] Depend on Figure 1-3 Shown, the present invention is realized by the following steps in concrete implementation:
[0017] (1) During the mining roadway excavation of the working face, the roadway is excavated along the roof 1, the bottom of the roadway is horizontal, the two sides are vertical, the top is inclined along the inclination angle of the rock formation, and the false roof is removed. The height at the centerline of the roadway is supported by anchor net cable joint support 4;
[0018] (2) Before the mining of the working face, in the mining roadway in front of the working face, the top edge of the roadway high side 2 side is top-cut and drilled 6, so that the roof of the roadway and the roof of the working face can be disconnected smoothly, ensuring the integrity and stability of the roof of t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


