A micro-surface layer and its low-temperature construction method
A construction method and micro-surface technology, applied in the direction of roads, on-site coagulation pavement, buildings, etc., can solve the problems of difficult to guarantee construction quality, economic loss, inability to guarantee the adhesion performance of emulsified asphalt, etc. Construction period, the effect of reducing dependence
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] An embodiment of the micro-surface layer low-temperature construction method of the present invention, the method described in this embodiment includes the following steps:
[0021] (1) Before construction, the pits and grooves on the original road surface should be repaired, the expansion joints and cracks should be filled, compacted, and smoothed; use an air compressor (or back-type blower) to remove debris on the road surface to ensure that the road surface is clean and tidy;
[0022] (2) Stir and stir the raw materials, spread them on a clean and tidy road surface, and compact them to obtain the road surface after the construction of the micro-surface layer; wherein, the raw materials include the following components by weight: finely processed granules 100 parts of basalt or diabase or diorite with a diameter of 0-10mm, 13 parts of SBS modified emulsified asphalt, 3 parts of water, 3 parts of ordinary Portland cement, the temperature of the SBS modified emulsified a...
Embodiment 2
[0025] An embodiment of the micro-surface layer low-temperature construction method of the present invention, the method described in this embodiment includes the following steps:
[0026] (1) Before construction, the pits and grooves on the original road surface should be repaired, the expansion joints and cracks should be filled, compacted, and smoothed; use an air compressor (or back-type blower) to remove debris on the road surface to ensure that the road surface is clean and tidy;
[0027] (2) Stir and stir the raw materials, spread them on a clean and tidy road surface, and compact them to obtain the road surface after the construction of the micro-surface layer; wherein, the raw materials include the following components by weight: finely processed granules 100 parts of basalt or diabase or diorite with a diameter of 0-10mm, 11 parts of SBS modified emulsified asphalt, 8 parts of water, 2 parts of ordinary Portland cement, the temperature of the SBS modified emulsified a...
Embodiment 3
[0030] An embodiment of the micro-surface layer low-temperature construction method of the present invention, the method described in this embodiment includes the following steps:
[0031] (1) Before construction, the pits and grooves on the original road surface should be repaired, the expansion joints and cracks should be filled, compacted, and smoothed; use an air compressor (or back-type blower) to remove debris on the road surface to ensure that the road surface is clean and tidy;
[0032] (2) Stir and stir the raw materials, spread them on a clean and tidy road surface, and compact them to obtain the road surface after the construction of the micro-surface layer; wherein, the raw materials include the following components by weight: finely processed granules 100 parts of basalt or diabase or diorite with a diameter of 0-10mm, 16 parts of SBS modified emulsified asphalt, 5 parts of water, 1 part of ordinary Portland cement, the temperature of the SBS modified emulsified as...