Pressure-limited and discharge-quantity-unlimited fracturing method for increasing shale gas crack transforming size

A technology for stimulating volume and shale gas, applied in the fields of fluid production, earth-moving drilling, wellbore/well components, etc., can solve the problems of difficulty in the extension of fractures on rallies, limited lifting range, etc. Well-designed effects

Active Publication Date: 2017-12-15
CHINA PETROLEUM & CHEM CORP +1
View PDF7 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

It can improve the current fracturing process, such as: limited net fracturing promotion range of fractures, difficulty in extending fractures at high peaks, early settlement of proppant and the widening of far-well fractures due to early settlement of proppant. Various problems such as sand plugging in the later stage of construction caused by narrowing will increase the actual post-fracture volume of shale reservoirs and the complexity of artificial fractures

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0049] Well A is a shale gas horizontal well with a target layer depth of 2305.7-2438m. Well logging shows that the horizontal maximum principal stress of the well is 61.7MPa, the horizontal minimum principal stress is 45.2MPa, and the vertical principal stress is 52MPa. Its modulus is 36GPa and Poisson's ratio is 0.189. Horizontal bedding fractures are developed in the target layer of this well, and some bedding fractures are filled by calcite. Utilize the method provided by the present invention to implement pressure-limited and unlimited-displacement fracturing construction to the well, and the specific implementation steps are as follows:

[0050] 1) By analyzing the geological data of the well, the shale gas well target layer only develops horizontal bedding fractures, and it is judged that the well can be constructed by the method of the present invention;

[0051] 2) Carry out small-scale fracturing tests according to the conventional step-up and step-down, using slick ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a pressure-limited and discharge-quantity-unlimited fracturing method for increasing the shale gas crack transforming size. The pressure-limited and discharge-quantity-unlimited fracturing method comprises the steps that (1) reservoir evaluation before fracturing and real-time evaluation of the fracturing construction earlier stage are conducted; (2) a layered small testing fracturing test is conducted on a straight well guiding well; (3) simulation analysis is conducted through software MEYER; (4) normal fracturing construction is conducted, and in the construction midway, one-time or two-time instantaneous pump stopping is conducted; (5) the wellhead construction anticipated pressure is derived reversely through the well bottom pressure; (6) as long as the wellhead construction pressure is lower than the anticipated pressure of the step (5), the discharge quantity is increased to enable the wellhead pressure to approximate the anticipated value; and (7) if the wellhead construction pressure after the discharge quantity is increased still does not reach the anticipated pressure, the construction sand-liquid ratio is increased. According to the pressure-limited and discharge-quantity-unlimited fracturing method for increasing the shale gas crack transforming size, the various problems caused by using a discharge-quantity-limited method can be solved, so that the actual after-fracturing transforming size of a shale reservoir is increased, and the complexity of man-made cracks is improved.

Description

technical field [0001] The invention relates to the field of petroleum exploitation, and more specifically, relates to a fracturing method for increasing the volume of shale gas fracture reconstruction with limited pressure and unlimited displacement. Background technique [0002] In shale gas fracturing construction, on the premise of ensuring construction safety, how to maximize the fracture complexity and reconstructed volume is an eternal theme. However, in the current fracturing operation, the displacement is mainly maintained at a basically constant rate, which has a certain impact on our goal of increasing the complexity of the fracture and the volume of the reconstruction. [0003] At present, from a technical point of view, the method of limiting the displacement we use in fracturing construction has the following main problems: [0004] 1) The net pressure increase range of the main fracture is limited. Especially for shale with good brittleness, during the proce...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21B43/26
CPCE21B43/26
Inventor 蒋廷学路保平苏瑗王海涛刘红磊姚奕明卫然徐胜强
Owner CHINA PETROLEUM & CHEM CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products