Method and device for preventing heavy material in blast furnace top tank
A technology for a blast furnace and a charging tank is applied in the field of preventing the heavy charging of the charging tank on the top of the blast furnace, and can solve problems such as heavy charging accidents, and achieve the effects of reducing the probability of occurrence, ensuring normal operation, and avoiding the blast furnace air break.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] The embodiment of the present invention provides a method for preventing heavy material in the top tank of a blast furnace. The blast furnace includes: a feeder, a vibrating screen, a combined silo, and a top tank. The combined silo is controlled by the silo CPU. The tank is controlled by the furnace top CPU; the feeder feeds the combined silo through the vibrating screen, and the combined silo feeds the furnace top tank.
[0059] See figure 1 , The method for preventing heavy material in the blast furnace top tank provided by the embodiment of the present invention includes:
[0060] Step S10, judging whether the communication between the silo CPU and the furnace top CPU is abnormal, and issuing a heavy material alarm when the communication is abnormal, specifically including: Step S101, setting a first response time, such as setting the first response time to 20S. Step S102: When the silo CPU sends the loading signal to the furnace top CPU, control the silo CPU to send the...
Embodiment 2
[0067] See figure 2 , The embodiment of the present invention provides a device for preventing heavy material in the top tank of a blast furnace, including: a first processing unit, a second processing unit, a third processing unit, and a fourth processing unit.
[0068] The first processing unit is used to determine whether the communication between the silo CPU and the furnace top CPU is abnormal, and to give a heavy material alarm when the communication is abnormal. Specifically, in the first processing unit: the first response time is set by the first setting module. When the silo CPU sends the three inspection signals to the furnace top CPU, the first control module controls the silo CPU to send the first signal to the furnace top CPU and triggers the first timer to start timing; the furnace top CPU feeds back the first signal to the furnace top CPU. Store the CPU and trigger the end of the first timer. The timing time of the first timer is obtained by the first obtaining ...