Full grouting sleeve for connecting of double bundled bars and connecting method of double bundled bars

A double-joint reinforcement and full-grouting technology is applied to structural elements, building components, building reinforcements, etc. It can solve the problems of double reinforcement welding quality, impossibility, inconvenient use, etc., so as to achieve small space occupation and safe connection interface , the effect of convenient positioning

Inactive Publication Date: 2018-02-27
HUNAN UNIV
View PDF3 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0010] When the reinforcement method of double parallel bars is introduced in the prefabricated concrete structural members due to the large number of steel bars, the connection between double parallel bars between two prefabricated components becomes a new problem in the engineering field. The connection method is aimed at a single steel bar. The lap connection method of double parallel bars in traditional cast-in-place concrete is inconvenient or even impossible to use in prefabricated concrete structures.
Although the connection method of welding is acceptable, there are many difficulties in ensuring the welding quality of double bars in adverse environments such as high altitude and on-site

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Full grouting sleeve for connecting of double bundled bars and connecting method of double bundled bars
  • Full grouting sleeve for connecting of double bundled bars and connecting method of double bundled bars
  • Full grouting sleeve for connecting of double bundled bars and connecting method of double bundled bars

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] Such as image 3 A full grouting sleeve for double parallel reinforcement connection is shown, including a metal sleeve (1) for connecting two sections of double parallel reinforcement, two sealing rings (2, 3), set in the middle part of the cavity of the metal sleeve (1) and the metal sleeve (1) as a whole, and limit the position of the double ribs in the two sections and pour into the metal sleeve (1) The grouting structure (9) formed with the grouting material in the cavity between the two sections of the double-jointed ribs, the metal sleeve (1) is a straight or fish-belly connecting sleeve, and the two sections of the double-jointed ribs pass through The grouting structure (9) is anchored and connected with the metal sleeve (1) as a whole; the double parallel ribs in the two sections are respectively the first double parallel ribs (7) inserted into the metal sleeve (1) from left to right and the double parallel ribs (7) by Insert the second section of double paral...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a full grouting sleeve for connecting of double bundled bars and a connecting method of the double bundled bars. The full grouting sleeve comprises a metal sleeve body (containing limiting stop blocks), two sealing rings and a grouting structure, wherein the metal sleeve body is used for connecting two sections of double bundled bars (two bundled bars), the two sealing rings are arranged at the two ends of the metal sleeve body, the grouting structure is formed by grouting materials grouted in a cavity between the metal sleeve body and the two sections of double bundledbars, and the metal sleeve body is in a straight line shape or a fish-bellied shape; the two sections of double bundled bars, corresponding to rebars, are distributed in the central axis of corresponding holes in the metal sleeve body; and a grout discharging hole and joint and a grout injecting hole and joint are formed in each side wall of the two ends of the metal sleeve body. The connecting method of the double bundled bars comprises the following steps that 1, the sealing rings are mounted, the double bundled bars are inserted in the metal sleeve body for positioning; 2, a grout discharging extension tube and a grout injecting extension tube are mounted (if necessary); 3, the grouting materials are grouted; and 4, curing is conducted. According to the full grouting sleeve for connecting of the double bundled bars and the connecting method of the double bundled bars, design is reasonable, construction is convenient, safe and economic, the connecting process of the double bundled bars can be completed efficiently, simply and conveniently, and connecting performance is reliable.

Description

technical field [0001] The invention belongs to the technical field of prefabricated concrete member construction, and in particular relates to a fully grouted sleeve for double parallel reinforcement connection and a double parallel reinforcement connection method. Background technique [0002] In order to reduce the self-weight of long-span and heavy-load concrete structural members in civil engineering fields such as construction engineering and bridge engineering, it is often necessary to control the cross-sectional dimensions of beams, slabs, columns and other members as much as possible during design, and there will be too many steel bars on the cross-section. Intensive conditions may lead to complex construction of concrete components and difficulty in controlling construction quality. [0003] In the actual design and construction process, civil engineers have given the "joint reinforcement" reinforcement configuration method to solve the problem of too many and too ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04C5/16
CPCE04C5/165
Inventor 张望喜王雄张瑾熠
Owner HUNAN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products