Pier column concrete curing structure and pier column construction system
A concrete and pier technology, applied in the field of bridge engineering, can solve problems such as poor maintenance effect, large environmental pollution, and poor health maintenance effect, and achieve the effects of good maintenance effect, high degree of automation, and convenient installation and use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] see figure 1 , this embodiment provides a pier column concrete maintenance structure, the maintenance structure is used to spray water on the pier column main body 100, the pier column main body 100 is a cylindrical body, and the pier column main body 100 can be a cylindrical pier, a square pier, etc. , in addition, cylindrical piers can be of equal or reduced diameter, see Figure 5 For example, the top of the pier main body 100 is in an eversion shape, and the outer diameter of the top gradually increases from bottom to top.
[0046] The maintenance structure includes a walking frame 200 , a sprinkler assembly 300 and a hoist 400 .
[0047] The walking frame 200 is made of steel splicing, and the walking frame 200 is a frame structure, which saves cost, is light in weight, and is flexible in movement. The middle part of the walking frame 200 has a cylindrical space 210 for accommodating the main body 100 of the pier column.
[0048] The spray assembly 300 includes ...
Embodiment 2
[0057] see figure 1 - Figure 4 , this embodiment provides a pier column concrete maintenance structure, the maintenance structure is used to spray water on the pier column main body 100. The outer diameter gradually increases from bottom to top.
[0058] The maintenance structure includes a walking frame 200 , a sprinkler assembly 300 and a hoist 400 .
[0059] The walking frame 200 is made of steel splicing, and the walking frame 200 is a frame structure, which saves cost, is light in weight, and is flexible in movement. The middle part of the walking frame 200 has a cylindrical space 210 for accommodating the main body 100 of the pier column.
[0060] The spray assembly 300 includes a nozzle 320 , a water pipe 330 and a water pump. The nozzle 320 communicates with the water pump through the water pipe 330 . Optionally in this embodiment, a splash guard is set outside the spray head 320. The splash guard is trumpet-shaped. When performing spray maintenance, the water spr...
Embodiment 3
[0074] This embodiment provides a pier column construction system, including a drainage channel and the concrete maintenance structure of the pier column provided in the above embodiment. The drainage channel is provided with a drainage gate. When water is not needed for spray maintenance, the drainage gate is opened to discharge the water , improve the utilization rate of water resources.