System and method for test of master station and substation of intelligent transformer substation phasor measurement unit

A technology of synchronized phasor measurement and smart substation, which is applied in the direction of measuring devices, measuring electricity, and measuring electrical variables, etc., to achieve the effect of rigorous testing process, high reliability and high precision

Inactive Publication Date: 2018-04-20
STATE GRID SICHUAN ELECTRIC POWER CORP ELECTRIC POWER RES INST +2
View PDF11 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The invention provides a master and substation test system and method for a synchronized phasor measuring device in a smart substation. The system expands the test range of the PMU tester in the smart substation from the substation to the dispatching WAMS master station, a...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • System and method for test of master station and substation of intelligent transformer substation phasor measurement unit
  • System and method for test of master station and substation of intelligent transformer substation phasor measurement unit
  • System and method for test of master station and substation of intelligent transformer substation phasor measurement unit

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The invention provides a master and substation test system and method for a synchronized phasor measuring device in a smart substation. The system expands the test range of the PMU tester in the smart substation from the substation to the dispatching WAMS master station, and solves the problem of testing the PMU device in the existing smart substation. The technical problems of joint commissioning and testing of the main and substations have increased the validity and credibility of the test of the synchrophasor measurement device of the smart substation.

[0035] In order to understand the above-mentioned purpose, features and advantages of the present invention more clearly, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that, under the condition of not conflicting with each other, the embodiments of the present application and the features in the embodiments can...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention discloses a system and a method for test of a master station and a substation of an intelligent transformer substation phasor measurement unit (PMU). The system comprises a PMU tester, a PC substation client and a PC master station client. The PC substation client controls the PMU tester to send a current and a voltage which have time marks to a PMU collection unit, the PMU collection unit centrally stores the current and the voltage in the PMU collection unit and then sends the current and the voltage to a dispatching master station; data in the PMU collection unit are transmitted back to the PMU tester after being processed by the PMU collection unit; the PC master station client analyzes current and voltage signals, uploaded to the master station, of a PUM device to form a master station data file; and master station data and substation data are correspondingly compared through analysis of the PMU tester to complete error calculation of the current and voltagedata. The technical problem of master station and substation joint debugging testing in a current intelligent transformer substation PMU device test is solved, and validity and dependability of the test of intelligent transformer substation phasor measurement unit are improved.

Description

technical field [0001] The invention relates to the field of WAMS (Wide Area Measurement System) application of dispatching master station and testing and research field of intelligent substation synchrophasor measurement device (PMU device), in particular, it relates to a master-substation test system and method of intelligent substation synchrophasor measurement device. Background technique [0002] The synchrophasor measurement function of the PMU device provides data source support for the WAMS application of the dispatching master station and the calculation and analysis of power grid security and stability, so it bears a major responsibility for the safety and stability of the power grid. In recent years, with the rapid development of smart substations, the testing of PMU devices in smart substations is urgently needed. At present, the test method of the PMU device in the smart substation is to control the PMU tester to send the voltage and current IEC61850-9-2 protoco...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G01R31/00
Inventor 何笠冯世林滕予非温丽丽姜振超刘明忠石涛熊亮
Owner STATE GRID SICHUAN ELECTRIC POWER CORP ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products