Matrix management system and method of multi groups of batteries in communication base station
A technology of matrix management and multi-group batteries, which is applied in the field of matrix management systems for multi-group batteries, to achieve the effect of solving circulating currents and being safe and reliable
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment example 1
[0070] Implementation case 1 (a total of three sets of batteries: one set of lead-acid, two sets of cascade batteries, corresponding to three or four types of mains):
[0071] Appropriate charging methods: sequential charging, continuous floating charging after the lead-acid battery is fully charged, optional floating charging or standby power shelving after the ladder lithium battery is fully charged, simultaneous discharge after the AC power failure, and cut off the discharge circuit when the battery is discharged to the secondary power-off voltage . When the mains is normal, the load is always powered by the charger.
Embodiment example 2
[0072] Implementation case 2 (a total of three sets of batteries, corresponding to new energy working conditions):
[0073] Suitable charging method: charging at the same time, because of the current limiting protection, overcharging will not occur. After being fully charged, it can be float charged according to requirements, and can be set aside for backup. When discharging, the ladder lithium battery is loaded and discharged.
Embodiment example 3
[0074] Implementation case 3 (a total of three sets of batteries: one set of lead-acid, two sets of cascaded batteries, corresponding to peak-shaving and valley-filling conditions):
[0075] Appropriate operation mode: charge at the same time when charging is required, disconnect the charger from the load when discharging is required, discharge with load by the step-by-step lithium battery, and reserve with lead-acid;
[0076] Valley power supply for 8 hours: start charging; flat power supply for 8 hours, keep fully charged; peak power supply battery discharge.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com