Movable formwork cast-in-situ road gully and construction method
A kind of drainage ditch and mobile technology, which is applied in the field of cast-in-place road drainage ditch and construction, mobile formwork cast-in-situ road drainage ditch and construction field, can solve the problem of spending a lot of time, reduce labor, improve economic benefits, save money The effect of reversing the template time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] Concrete pouring technical requirements, steel bar binding construction technical requirements, formwork support construction technical requirements, etc., will not be repeated in the present invention, and the structure and construction method involved in the present invention will be emphasized.
[0053] figure 1 It is a structural schematic diagram of the mobile formwork cast-in-place road drainage ditch of the present invention, refer to figure 1 The cast-in-place road drainage ditch of the mobile formwork is shown, and the cast-in-place road drainage ditch of the mobile formwork is mainly composed of drainage ditch foundation pit 4, unit steel sheet pile 1, drainage ditch, integrally formed steel cage 6, drainage ditch template, attachment Type vibrator 12, formwork moving car frame 16, adjustable formwork hanging beam, walking wheel 26, etc.; set unit type steel sheet pile 1 size 400×170×15.5L on both sides of the foundation pit of the drainage ditch, and set soli...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


