Unlock instant, AI-driven research and patent intelligence for your innovation.

Project schedule supervision control system

A project progress and control system technology, applied in the field of project progress supervision and control system, can solve problems such as project delay, cumbersome data collation, and multiple project supervision imbalances, and achieve the effects of reducing analysis and selection, facilitating management, and avoiding loss of control

Active Publication Date: 2018-06-22
浙江鼎力工程项目管理有限公司
View PDF6 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the current supervision system, for supervisors, there are many projects and it will be cumbersome to sort out various materials, and it is often difficult for supervisors to judge the urgency of the project they are responsible for in a timely manner. Reasonable management and control often requires supervisors to have rich work experience , but according to the ratio of supply and demand, at present, many projects still need to be assigned to some supervisors who are not particularly experienced. It is very cumbersome and inconvenient to manage and control. The delay will lead to the imbalance of supervision between multiple projects, affect the acceptance progress of multiple projects, bring immeasurable losses, and there is still room for improvement

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project schedule supervision control system
  • Project schedule supervision control system
  • Project schedule supervision control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The present invention will be further described in detail below with reference to the accompanying drawings.

[0041] A project progress supervision and control system disclosed in this embodiment can be presented in the form of a web page, or in the form of an APP or software. In this embodiment, it is preferably presented in the form of an APP. Serving the daily processing and timing of project node acceptance by the supervisor. like figure 1 As shown, it includes a login module 1, an entry module 2, an analysis module 3, an allocation module 4, an update module 5, and a project progress database 6 for storing various data.

[0042] The login module 1 obtains the management authority according to the unique identification information. The unique identification information can be through the account password, or the face recognition method, the fingerprint recognition method, the iris recognition method, etc., as long as it is for the unique identification information...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a project schedule supervision control system, which relates to the field of supervision control systems and solves the shortcomings that management and control on the projectby a supervisor can not be reasonably adjusted, and project delay and supervision imbalance among multiple projects are easily caused. The project schedule supervision control system in the technicalscheme is characterized by comprising a login module, an input module, an analysis module and a distribution module, wherein the login module is used for acquiring a corresponding management authorityaccording to unique identification information; the input module is used for inputting node completion schedule information corresponding to a node completion schedule in actual construction according to the management authority and storing the information to a project schedule database; the analysis module is used for carrying out project urgency degree analysis according to the node completionschedule information; and the distribution module is used for distributing the acceptance time for the project node according to the project urgency degree in response to the analysis module. according to the project schedule supervision control system disclosed in the invention, analysis on multiple projects and distribution of the acceptance time can be carried out intelligently and automatically, project delay caused by negligence of the supervisor in the case of management and control can be avoided, and the management and the control are orderly and convenient.

Description

technical field [0001] The invention relates to a supervision and control system, in particular to a project progress supervision and control system. Background technique [0002] At present, when supervising construction projects, a supervisor often needs to manage multiple projects at the same time, and most of the current project management processes still require repeated verbal communication or meetings between the supervisor and the construction party. , so that the supervisor can monitor the overall progress of the construction party, and supervise and carry out the acceptance of each node. The supervisor's acceptance of the node of the project directly affects whether the project can continue normally. In the current supervision system, for supervisors, there are many projects and it will make various data sorting cumbersome, and it is often difficult for supervisors to judge the urgency of the projects in charge in a timely manner. Reasonable management and control ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10
CPCG06Q10/103
Inventor 张继身曹时敏张笃霖潘翔
Owner 浙江鼎力工程项目管理有限公司