Optimal island partition calculation method involving distributed power-supply power distribution network

A distributed power supply and island division technology, applied in the direction of electrical components, circuit devices, AC network circuits, etc., can solve the problems of distribution network operation mode and management complexity, not allowing island operation, and limited contribution to clean power generation

Inactive Publication Date: 2018-06-29
STATE GRID SHANDONG ELECTRIC POWER CO SHOUGUANG POWER SUPPLY CO +1
View PDF3 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

With the continuous improvement of DG penetration rate, the operation mode and management of distribution network are also more complicated. The current DG grid-connected regulations do not allow island operation, and require that DG must withdraw quickly when a fault or disturbance occurs, resulting in the limitation of DG's contribution to the distribution network. in clean power generation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Optimal island partition calculation method involving distributed power-supply power distribution network
  • Optimal island partition calculation method involving distributed power-supply power distribution network
  • Optimal island partition calculation method involving distributed power-supply power distribution network

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0062] The embodiment includes a calculation method for optimal island division of a distributed power distribution network, including a modeling stage, an island search stage, and a verification stage.

[0063] The modeling stage is to transform the original distribution network containing DG into a connected graph with edge weights. The weight of an edge is determined by the power of the load connected to the edge and the importance of the load. The weight can be determined by According to the multi-index quantitative evaluation method, the greater the importance, the smaller the calculated weight, and the higher the priority of the corresponding load.

[0064] In the island search stage, the improved dynamic programming algorithm is used to search the connected graph, and the power balance area is selected according to the capacity of the DG, the weight of the edge and the size of the load power, and the island operation separation point is obtained.

[0065] The verificati...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an optimal island partition calculation method involving a distributed power-supply power distribution network. The method includes the step that under a distributed power generation condition, a power distribution network model is simplified and constructed, wherein during construction of the model, an original power distribution network involving DG is converted into a connected graph the borders of which have weights, the weights of the borders are determined by the power of connected loads and the significance of the loads and can be obtained by means of a multi-index quantitative evaluation method, the higher the significance is, the smaller the obtained weights will be, and the priorities of the corresponding loads are higher. The method has the advantages that an improved dynamic planning algorithm is provided for conducting island partition solution, a reasonable planning island scheme can be accurately and quickly calculated, the purpose is to achieve the maximum power recover, the significance of the loads is comprehensively taken into account, the solution speed of problems can be effectively increased, the solution precision of the problems can be effectively improved, and an important scientific basis can be offered to dynamic planning of the power distribution network.

Description

technical field [0001] The invention relates to the field of power grid operation and planning, in particular to a planning calculation method for island division of a distribution network with distributed power sources. Background technique [0002] With the gradual maturity of distributed generation (Distributed Generation, DG) technology, the DG that uses various renewable energy as primary energy in the distribution network is increasing year by year. With the continuous improvement of DG penetration rate, the operation mode and management of distribution network are also more complicated. The current DG grid-connected regulations do not allow island operation, and require that DG must withdraw quickly when a fault or disturbance occurs, resulting in the limitation of DG's contribution to the distribution network. in clean power generation. However, the advantages of DG in terms of power generation flexibility have not been fully utilized. The island division scheme and...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00H02J3/38
CPCH02J3/00H02J3/382H02J3/388H02J2203/20
Inventor 张成龙刘军王效平祖连波王栋业张美玲张志村尉俊霞董波刘杨李秀伟李晓燕
Owner STATE GRID SHANDONG ELECTRIC POWER CO SHOUGUANG POWER SUPPLY CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products