Grouted steel pipe pile foundation strengthening system and construction method thereof

A foundation reinforcement and grouting steel pipe technology, which is applied in the direction of foundation structure engineering, sheet pile wall, soil protection, etc., can solve the problems of large working space, high cost and defects in pile foundation construction quality of the working surface, and achieve the goal of working surface and The effect of small working space and convenient construction

Pending Publication Date: 2018-07-10
CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF9 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The basement structure that has been put into use needs to be reinforced due to structural design errors caused by insufficient geological survey data, changes in building functions, increased use load, and defects in pile foundation construction quality. Traditional foundation reinforcement systems have unstable reinforcement effects, Disadvantages of large working surface and working space, slow construction progress and high cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Grouted steel pipe pile foundation strengthening system and construction method thereof
  • Grouted steel pipe pile foundation strengthening system and construction method thereof
  • Grouted steel pipe pile foundation strengthening system and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] Embodiments of the present invention are described below through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific implementation modes, and various modifications or changes can be made to the details in this specification based on different viewpoints and applications without departing from the spirit of the present invention.

[0037] see first figure 1 As shown, the technical scheme that the present invention takes is to provide a kind of grouting steel pipe pile foundation reinforcement construction method, and it mainly comprises the following steps:

[0038] Step 101: Set the pressure pile hole of the steel pipe pile on the bottom plate of the building structure, and bury the static pressure pile anchor rod around the pressure pile hole; Step 102: Fix th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a grouted steel pipe pile foundation strengthening system and a construction method thereof. A static pile pressing anchor rod is embedded in a bottom plate of a building structure to fix a pile pressing counter force frame, the self-weight loads capable of being applied by the building structure serves as pile pressing counter force, a jack is used for pressing pile sections of the steel pipe pile into the foundation section by section through a pile pressing hole reserved or chiseled in the bottom plate, construction is convenient, and the operation face and the operation space are small. During pile sealing, after the anchor rod is bent, connection ribs are used for being connected with anchoring ribs on the top of a steel pipe column into a whole. The non-contractible grouting material is used for connecting a pile head with the bottom plate of the building structure together, the purposes of improving the foundation bearing force and controlling sedimentation are achieved, and the enough length is designed according to the specific stress situation. Restraint type grouting is adopted in a lower pile body of the steel pipe pile, an enlarged pile body partis formed, the bond stress of the pile body and the surrounding soil body is enhanced, and therefore after grouting, the single-pile pulling resistance (anti-pressing) bearing force of the steel pipepile is enhanced, and integral stress is formed through the pile head and foundation rigidity connecting combination.

Description

technical field [0001] The invention relates to the technical field of building foundation construction, in particular to a foundation reinforcement system of grouted steel pipe piles and a construction method thereof. Background technique [0002] The basement structure that has been put into use needs foundation reinforcement due to structural design errors caused by insufficient geological survey data, changes in building functions, increase in use load, and defects in pile foundation construction quality. Traditional foundation reinforcement systems have unstable reinforcement effects, The shortcomings of large working surface and working space, slow construction progress and high cost. Contents of the invention [0003] In view of the existing or potential deficiencies in the above-mentioned prior art, the present invention provides a foundation reinforcement system of grouted steel pipe piles and its construction method. Good ground reinforcement effect. [0004] I...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D7/20E02D15/04E02D5/38E02D5/48E02D3/00
CPCE02D3/00E02D5/38E02D5/48E02D7/20E02D15/04
Inventor 赵中兴胡大伟罗亚楠韩凯李战强林哲
Owner CHINA CONSTR EIGHT ENG DIV CORP LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products