Rapid construction method for continuous steel truss girder flexible arch steel bridge

A construction method and technology of rigid truss girders, which are applied to bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of heavy construction period pressure, large project scale, and increased construction costs, so as to increase available time, high construction efficiency, and Guarantee the effect of construction quality

Inactive Publication Date: 2018-08-03
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP
View PDF3 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The span layout of the main bridge of the Yinchuan Airport Yellow River Bridge on the Yinchuan Railway is as follows: 98m simply supported rigid truss girder + 2 × (3 × 168m) continuous rigid truss girder flexible arch + 98m simply supported rigid truss girder. The construction method, the pressure of the construction period is huge, and the construction cost is also greatly increased.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rapid construction method for continuous steel truss girder flexible arch steel bridge
  • Rapid construction method for continuous steel truss girder flexible arch steel bridge
  • Rapid construction method for continuous steel truss girder flexible arch steel bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0028] In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientation or positional relationships shown in the drawings, and are only for the convenience of describing the present invention Creation and simplification of description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limiting the invention. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should no...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a rapid construction method for a continuous steel truss girder flexible arch steel bridge. While lower structure construction is performed, an initial inter-section steel girder assembling bracket and other brackets are arranged in a middle span; a girder erection crane is assembled on the initial inter-section steel girder assembling bracket; a steel truss girder is assembled; an arch erection crane is assembled; after the middle span steel truss girder is erected, the arch erection crane begins to erect a middle span flexible arch; retreat is performed after a side span steel truss girder is completed, and then part of inter-section side span flexible arch is erected; after the arch erection crane completes the middle span flexible arch erection, the side span part inter-section flexible arch erection continues to be completed; a temporary stance platform is arranged at the flexible arched girder end of the continuous steel truss girder, a closure gap positionis integrated; the girder erection crane is located on the temporary stance platform, a flexible arch closure section is mounted, and steel truss girder flexible arc mounting is completed. In the rapid construction method, the continuous steel truss girder and the flexible arch are synchronously constructed, which effectively shortens the installation period of the steel girder itself and effectively shortens the total construction period, and the construction quality is high.

Description

technical field [0001] The invention belongs to the technical field of bridge engineering construction, and in particular relates to a rapid construction method of a continuous rigid truss girder flexible arch steel bridge. Background technique [0002] The construction method of the long-span rigid truss girder flexible arch bridge has a great influence on the construction cost and construction period. At present, the conventional construction method of this type of bridge is: (1) construct the substructure first and then construct the superstructure or although the superstructure and the substructure are constructed simultaneously, but the superstructure is not in the design plane or vertical position, it needs to be adjusted in place later; ( 2) The continuous rigid truss girder is constructed first, and then the flexible arch is constructed; (3) The closing mouth is usually set in the middle of the bridge span. The span layout of the main bridge of the Yinchuan Airport ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00E01D12/00
CPCE01D21/00E01D12/00
Inventor 宋伟俊陈宁贤龚国锋曲江峰章耀林霍艳蕾常洁于龙波邢如祥朱林达张静李永梁新礼宋于祺吴海勃岳旭光
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products