Combined construction method for short spiral soil squeezing cast-in-place pile and assembled drilling tool
A construction method and technology of cast-in-place piles, which are applied in the direction of earthwork drilling, drill bits, and sheet pile walls, etc., can solve the problems of inability to complete the drilling operation of short spiral soil-squeezing piles, difficulty in the construction of short-screw squeezed soil-filling piles, and construction methods. Increased equipment costs and other issues to achieve the effect of expanding the use of rock and soil formations, saving drilling tool costs, and being applicable to a wide range of formations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0068] The assembled drilling tool is composed of 7 kinds of split drilling tools in any combination.
[0069] Such as Figure 1-7 As shown, the 7 kinds of split drilling tools are: drill split drilling tool 1, extruded and expanded split drilling tool A2, extruded and expanded split drilling tool B3, extruded and expanded split drilling tool C4, right-handed split drilling tool 5 , left-handed split drilling tool 6 and non-helical split drilling tool 7.
[0070] The bottom of the drill bit split drilling tool 1 is provided with a drill point 11 and a pick 12, and the top is a hollow inner hexagonal quick joint.
[0071] The lower part of the extruded and expanded split drilling tool A2 is a hollow frustum 21 with left-handed external thread, and the outer diameter of the hollow frustum gradually increases from bottom to top; the upper part of the extruded and expanded split drilling tool A2 is a hollow cylinder with equal diameter The extruded body X22; the diameter of the ...
Embodiment 2
[0091] Such as Figure 12 As shown, the combined construction method of short spiral soil-squeezing cast-in-situ piles of the present invention includes analysis of geological conditions of the construction site, determination of construction methods, selection of construction drilling tools and application of construction process flow.
[0092] 1) The engineering project is a deep foundation pit support pile, which is judged by the hammer number N value of the standard penetration in-situ test, N=23. For the reinforced concrete cast-in-situ pile, in order to improve the horizontal resistance of the single pile, construction method 1 is adopted, and the assembled drilling tool adopts Figure 9 The drilling tool shown is the first form of the combined drilling tool ① in Embodiment 1.
[0093] 2) Align the drilling rig equipped with the combined drilling tool with the pile position, adjust the verticality of the main mast of the drilling rig, start the power head of the drilling...
Embodiment 3
[0098] Such as Figure 13 As shown, the combined construction method of short spiral soil-squeezing cast-in-situ piles of the present invention includes analysis of geological conditions of the construction site, determination of construction methods, selection of construction drilling tools and application of construction process flow.
[0099] 1) The project design is a 26-story residential building, and the composite foundation design uses φ400 plain concrete squeezed soil pouring piles. The geological survey report of the construction site shows that the site is a double-layer foundation, the upper stratum is medium-dense silt, and the lower stratum is deep and fully weathered For strata, the number of standard penetration hits is N=62 hits, therefore, method 2 is selected, and in order to improve construction efficiency, Figure 10 The assembled drilling tool shown is the first form of the assembled drilling tool ② in Embodiment 1.
[0100] 2) Align the drilling rig equi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 