Post-grouting construction method for long helical bore grouting pile and its grouting device

A long auger hole grouted pile post-grouting processing method and the postposition grouting device, which has the following step: firstly, the postposition grouting device is made; then, the long earth auger is used to drill; the plain concrete is pumped into the hole of the pile; after pouring the concrete on the pile stem, the grouting device is hung up and disposed above the pile stem before the cement is initially set; the hammer of the grouting device is started, and the postposition grouting device is immersed into the pile stem to the design elevation under the action of the exciting force and the leading of the guide member; the hammer is vibrating while being lifted and the hammer is drawn, then the hammer is closed, to set the postposition grouting device in the pile stem; after the pile stem concrete pouring is completed and the cement is finally set, the grouting is processed by the pile toe grouting pipe and the pile side grouting pipe, to make the soil mass in some distance around the pile toe and the pile cycle being reinforced. The invention greatly advances the bearing capacity of pile, reduces the engineering quality hidden danger of the long auger hole grouted pile and the amount of pile compared with the traditional technology, lowers the basic engineering invest.
Owner:JIAN YAN FOUND ENG

Microorganism soil-reinforcement cement fly-ash gravel (CFG) pile composite foundation and construction method

The invention discloses a microorganism soil-reinforcement cement fly-ash gravel (CFG) pile composite foundation and a construction method. The construction method comprises the steps that a, a pile pipe is pressed into a foundation; b, microorganism bacterium liquid is injected into the pile pipe at the same time, and the microorganism bacterium liquid is made to diffuse towards the foundation around the pile pipe; c, the microorganism bacterium liquid is pumped out, and a cementing solution is injected into the pile pipe and made to diffuse to the foundation around the pile pipe and reacts with the microorganism bacterium liquid to generate calcium carbonate crystals, and incompact sandy soil or floury soil is cemented; d, the step b and the step c are executed repeatedly till the soil around the pile pipe meets the reinforcement requirement; e, pipe-drawing pile formation is conducted while cement-ash stabilized aggregates are poured; and f, a bed course is laid, so that the CFG pile composite foundation is formed. According to the microorganism soil-reinforcement CFG pile, the soil around the pile pipe is reinforced through calcium carbonate generated through reaction between the microorganism bacterium liquid and the cementing solution, so that the strength of the soil around the pile pipe is improved, and the quality problems of necking, pile breakage, soil carrying and the like in the pile forming process are solved; in addition, a reinforced soil body can be combined with a pile for bearing, and the bearing capacity of the single pile is effectively improved.
Owner:NANJING FORESTRY UNIV

Bottom-grouting-enlarged small-diameter prestressed tubular pile composite foundation construction method

The invention discloses a bottom-grouting-enlarged small-diameter prestressed tubular pile composite foundation construction method for processing a small-area/narrow-range deep mucky soil or soft clay foundation, which is characterized in that: by utilizing the high bearing capacity and pile-bottom concrete reinforced and enlarged ends of bottom-grouting-enlarged small-diameter prestressed tubular piles, the bottom-grouting-enlarged small-diameter prestressed tubular piles effectively reduce diameters of pile bodies of the conventional prestressed tubular piles, reduce the buried depths of the pile bodies, and are arranged in a plane at a proper pile spacing to achieve micro shallow and dense pile group effect and achieve shallow soft field soil composite foundation reinforcement effect. The method has the advantages that: on bottom-grouting-enlarged small-diameter prestressed tubular pile composite foundation, the small-diameter prestressed tubular piles are used to compact the surrounding soil to transfer load, and grouting and reinforcement of pile bottoms are performed to improve the end bearing capacity, so that a shallow pile-based composite foundation is formed. Compared with a normal large-area soft soil foundation composite foundation processing method and a prestressed tubular pile foundation method, the method has the characteristics of simple process, high construction speed, miniature construction equipment, material saving and low cost.
Owner:HOHAI UNIV

Pretensioned prestressed concrete quadrilateral pile and production method thereof

The invention discloses a pretensioned prestressed concrete quadrilateral pile, which is characterized by comprising a plurality of main reinforcements, wherein the main reinforcements are welded with spiral reinforcements; the heads of the main reinforcements are greater than the diameters of the main reinforcements; both ends of the main reinforcements are connected with quadrilateral end plates respectively; concrete is poured outside a reinforcement cage frame consisting of the main reinforcements and the spiral reinforcements; the concrete is combined with the reinforcement cage frame into an integral quadrilateral pile body; and the center of the quadrilateral pile body is provided with a central round hole passing through the whole quadrilateral pile body. Aiming to overcome the deficiencies in the prior art, the invention provides the pretensioned prestressed concrete quadrilateral pile which has the advantages of high molding quality, high bearing capacity of a single pile, damage resistance during use of the reinforcement frameworks, high bending resistance bearing capacity, high shearing resistance, convenient stacking, and difficult damage during hoisting, transporting and transferring the pile. The invention also aims to provide a production method of the pretensioned prestressed concrete quadrilateral pile.
Owner:句容长江建材有限公司

Composite pile structure serving as main structure stand column and construction method thereof

The invention discloses a composite pile structure serving as a main structure stand column and a construction method of the composite pile structure. The composite pile structure comprises a precast pile with brackets, wherein the precast pile is in a sectioned type, a pile head is arranged at the pile bottom of the precast pile, one bracket is arranged on the pile top of the precast pile, a through hole is formed in the center of the precast pile, a reinforcement cage is arranged in the through hole, and the through hole in the center of the precast pile is filled with grouting materials; the composite pile structure is used as the main structure stand column in the later period, the underground portion of the sectioned precast pile is wrapped by the grouting materials, a prestressed pipeline is arranged in the wall of the sectioned precast pile, prestressed reinforcing steel is arranged in the prestressed pipeline, and grouting holes are formed in the wall of the precast pile, and communicated with the through hole in the center of the precast pile. The composite pile structure has the advantages that the technological process such as mud wall protection is omitted, so that the construction cycle is shortened; the composite pile structure can serve as a stress component of a main structure, a load-bearing member does not need to be built again, the cost is saved, and pile formation quality is good; the composite pile structure can effectively solve the problem that hole collapse, hole shrinkage, pile breakage and sandwiching of a cast-in-situ bored pile happen in the construction process, and pile formation quality is guaranteed.
Owner:JINAN RAILWAY TRANSPORT GRP CO LTD

Rock-socketed hollow precast pile and rock-socketed construction method using precast pile

The invention provides a rock-socketed hollow precast pile and a rock-socketed construction method using the precast pile. The precast pile comprises a hollow pile body and a rock-socketed pile tip. The rock-socketed pile tip comprises a steel pipe pile joint section and a big-end-up circular-truncated-cone-shaped pile tip prefabricated by concrete, the steel pipe pile joint section comprises a thin-wall steel pipe, core filling concrete filled in the thin-wall steel pipe and a plurality of stiffening plates welded to the outer wall of the thin-wall steel pipe, and the core filling concrete and the circular-truncated-cone-shaped pile tip are integrally formed in a pouring mode. When rock-socketed construction is carried out, firstly, pile sinking equipment is adopted for sinking a precastpile till drilling footage is difficult, then, a rock core drilling machine is adopted for drilling or crushing plain concrete filling cores at the pile tip part and a hard soil layer and a rock stratum below the pile tip part from the hollow part of a pile body of the hollow precast pile to the designed pile bottom elevation, and a rock-socketed section pile hole is formed; and finally, the forcetransmission framework is put in, cementing materials are injected, and construction of the hollow precast rock-socketed pile is completed.
Owner:WUHAN SURVEYING GEOTECHN RES INST OF MCC

Pile and soil concreted and integrated composite pile and construction method thereof

InactiveCN105484230AImprove weaknessOptimizing the distribution of carrying capacityBulkheads/pilesSoil preservationHigh strength concreteStress distribution
The invention discloses a pile and soil concreted and integrated composite pile and a construction method thereof. The pile and soil concreted and integrated composite pile comprises a peripheral compact soil layer. The compact soil layer is filled with in-site soil and a granular material and curing agent concreted body. The concreted body is integrally provided with a reinforced concrete pile, wherein the reinforced concrete pile and the concreted body are concreted into a whole. According to the pile and soil concreted and integrated composite pile and the construction method thereof, a frequently-used flexible granular material pile, a semi-rigid cemented soil pile, a rigid high-strength concrete pile are constructed in a compositing manner, the composite pile with the complementary strengthening and synergetic bearing functions is formed, the defect of a single pile method is overcome, and the beneficial effects of the single pile method are maintained, quality is reliable, construction is easy and convenient, manufacturing cost is low, the strength, rigidity and density are high, and the pile body size is large, so that the single-pile bearing capacity of the composite pile is high, meanwhile the weak state of soil among piles is improved greatly, and pile and soil bearing capacity distribution and pile body stress distribution are optimized; and the pile and soil concreted and integrated composite pile can be used as a vertical reinforcement body in a composite foundation as well as a single rigid pile with the compression resistance, pulling resistance, leveling resistance and corrosion resistance functions, can be used for foundation pit supporting and diaphragm wall engineering and has the wide application prospects.
Owner:邓亚光

Pile mould for PCC pile and construction method for overlong PCC pile

The invention discloses a pile mould for a PCC pile and a construction method for an overlong PCC pile. The pile mould consists of a feeding section, one or more segments of intermediate sections and a pile tip section which are connected sequentially; the connection among the sections can be disassembled; and inner pipes of the sections at connecting ends are longer than outer pipes, the inner pipes are connected directly at a connecting position, and the outer pipes are connected by outer pipe connecting sections. The construction method for the overlong PCC pile comprises the following steps: firstly, sinking the pile tip section of the pile mould in foundation soil, and then sinking one or more segments of intermediate sections in the foundation soil until the sunk pile mould reaches a designed pile length; and after concrete is poured, pulling out the pile mould in a subsection mode. The construction method overcomes the restriction to the length of the PCC pile, and the pile length of the PCC pile for construction is increased greatly through the connection of the pile mould of each section so as to implement the construction of the overlong PCC pile. The pile mould can adapt to requirements of different pile lengths due to the detachable pile mould, and is convenient to transport; and the sections of the pile mould are simple in connection and convenient in operation.
Owner:HOHAI UNIV

Anti-deformation supporting structure of foundation pit and construction method thereof

The invention discloses an anti-deformation supporting structure of a foundation pit and a construction method thereof. The anti-deformation supporting structure comprises a plurality of pre-stressedconcrete pipe piles vertically and parallelly arranged around the foundation pit, wherein the pile tops of the two adjacent pre-stressed concrete pipe piles are connected through crown beams; first supporting plates are fixed in the tops of the pre-stressed concrete pipe piles in the radial direction, a plurality of main steel bars are fixed on the first supporting plates through fill core concrete, all the main steel bars are arranged in a circle evenly around the inner walls of the pre-stressed concrete pipe piles, and the main steel bars are connected into a whole through stirrups; each main steel bar is formed by connecting a vertical section and an inclined section, wherein each vertical section is fixed inside each pre-stressed concrete pipe pile and each inclined section is fixed inside each crown beam; and the inclined sections incline toward the outer sides of the pile walls of the pre-stressed concrete pipe piles, and bend inward at the top ends of the pre-stressed concrete pipe piles. The anti-deformation supporting structure can meet the stability requirement of foundation pit deformation in the case of reducing building energy consumption and the use of building materials, the noise and pollution to the environment produced by construction machinery are very little, and construction is green and environment-friendly.
Owner:广西建工集团土木工程有限公司

Double consolidated foundation treatment method using construction waste aggregate and composite foundation

The present invention provides a double consolidated foundation treatment method using construction waste aggregate. The double consolidated foundation treatment method using construction waste aggregate comprises the following steps: a. pre-setting a number of pile points on the surface of the foundation, and placing the aggregate into the aquifer or the permeable layer at the lower part of the aquifer through a immersed tube at a plurality of pile points to form a plurality of vertical drainage bodies; b. compacting a plurality of vertical drainage bodies through the way of tamping, and forming a wedge-shaped drainage pile body with wide-top and narrow-bottom or big-top and small-bottom respectively, thereby compacting the periphery soil body by the lateral expansion process of the drainage body forming the wedge-shaped structure, and forming a dense pile-to-pile soil body, at the same time, the water contained in the soil is squeezed to both sides of the wedge-shaped drainage pile body and squeezed into the adjacent vertical drainage body, the pore water is discharged from the soil through the vertical drainage body by the compressive stress of the soil. According to the doubleconsolidated foundation treatment method using construction waste aggregate, the water content of the soil can be greatly reduced in the soft soil with large water content, so as to achieve the characteristics of high bearing capacity, short construction period and low cost. The invention further provides a composite foundation.
Owner:JIANGXI JIYE SCI & TECH

Vertical cement mixing pile forming device and forming construction method

The invention discloses a vertical cement mixing pile forming device and a forming construction method. The forming device comprises a vertical driving rod, a driving device, a vertical outer sleeve sleeving the outer side of the vertical driving rod and a mixing device installed on the lower portion of the vertical driving rod. The outer sleeve is connected with a cement paste pumping device. The mixing device comprises two horizontal driving rods and two groups of mixing impellers which are symmetrically arranged and perform vertical mixing synchronously. The forming construction method comprises a first step of construction preparation, a second step of cement mixing pile construction: a step 201 of drill-down mixing and spouting; a step 202 of lifting mixing and spouting; and a step 203 of pile body forming. The vertical cement mixing pile forming device is reasonable in design, simple and convenient to construct and good in using effect; in the cement mixing pile forming process, the vertical cement mixing pile forming device is favorable for drill-down mixing feeding of a vertical cement mixing pile device, the section of a pile body of a formed cement mixing pile is rectangular, the construction is simple and convenient, and the single cement mixing pile formed by construction has higher bearing capacity.
Owner:SHAANXI ZHUANGXIN CONSTR ENG

Construction method of prestressed pipe pile with vertical water discharge grooves

The invention particularly relates to a construction method of a prestressed pipe pile with vertical water discharge grooves, and is used for solving the problems in the traditional construction of the prestressed pipe pile, such as sedimentation, bearing capability reduction and pollution to the construction field. The construction method comprises the following steps of a. uniformly distributing water discharge grooves on external circumference of the prestressed pipe pile, and arranging a V-shaped groove between two adjacent water discharge grooves, wherein the V-shaped groove is communicated with the two adjacent water discharge grooves; b. installing a water accumulation protection drum with an opening at the bottom at the insertion position of the prestressed pipe pile, wherein a water guide pipe communicated with the water accumulation protection drum is arranged on sidewall of the water accumulation protection drum and a control valve is arranged on the water guide pipe; c. inserting the prestressed pipe pile along the opening of the water accumulation protection drum, wherein pore water enters the water discharge grooves under the action of pressure, the pore water in the water discharge grooves rises and is discharged through the water guide pipe; and d. installing the water accumulation protection drum to the insertion position of next prestressed pipe pile. The construction method has reasonable and reliable structure design, not only can reduce insertion resistance to improve construction progress rate, but also has good effect of inhibiting sedimentation after construction, and has the advantages of simpleness in structure and easiness in implementation and control.
Owner:CHINA RAILWAY 17 BUREAU GRP NO 6 ENG

Mechanical pile forming device for base-expanded poured foundation pile and pile forming method thereof

The invention relates to a mechanical pile forming device for a base-expanded poured foundation pile and a pile forming method thereof. The mechanical pile forming device for the base-expanded pouredfoundation pile comprises a powered rotating head providing power for a rotary shaft, a rotating transmission shaft connected below the powered rotating head, a steel pipe protective casing installedon the outer side of the rotating transmission shaft in a sleeving manner and a bottom-expanding drill bit connected to an end of the rotating transmission shaft. The mechanical pile forming method comprises the steps that hole drilling operation of a pile body A of the foundation pile is conducted; the bottom-expanding drill bit goes deep into the hole bottom along the interior of the steel pipeprotective casing, and hole expanding operation is conducted; a pre-lashed pile body steel bar reinforcement cage is fed from top to bottom along the interior of the steel pipe protective casing; foundation pile concrete is poured, and meanwhile, the steel pipe protective casing is elevated; and base-expanded poured foundation pile construction is conducted, and the base-expanded end B of the base-expanded poured foundation pile is formed below the pile body A of the foundation pile. The mechanical pile forming device for the base-expanded poured foundation pile has the advantages that the influence of underground water on pile forming is obstructed, the pile forming quality of the base-expanded poured foundation pile is improved, the foundation construction cost of projects is lowered, and construction efficiency is high.
Owner:范茂丰 +1

System for grouting pile side sealing and pile tip extrusion grouting of cast-in-place pile and construction method thereof

PendingCN114351688AHigh strengthIncrease pile side resistanceBulkheads/pilesSlurryRebar
The invention relates to a cast-in-place pile side slurry sealing and pile end extrusion grouting system and a construction method thereof.The cast-in-place pile side slurry sealing and pile end extrusion grouting system comprises a pile side slurry sealing device and a pile end extrusion grouting device, and the pile side slurry sealing device is arranged on the outer side face of a reinforcement cage of a cast-in-place pile; the upper end face of the pile end extrusion grouting device is fixedly connected with the bottom end of the reinforcement cage, the lower end face of the pile end extrusion grouting device abuts against pile bottom sediment in the sinking process of the reinforcement cage, and the pile bottom sediment is axially and downwards pushed, compacted and compacted through the pile end extrusion grouting device; the pile side slurry sealing device forms a pile side slurry sealing section on the outer side of the reinforcement cage after slurry jacking, high-pressure grouting is conducted on the pile end of the cast-in-place pile and the pile side range below the pile side slurry sealing section through the pile end extrusion grouting device, and grouting reinforcing layers are formed on the pile bottom face and the pile side face. The method has the advantages that the construction process is simple, the flowing direction and the diffusion range of grout injected into the pile end and the pile side can be quantitatively and controllably controlled, then the single-pile bearing capacity of the cast-in-place pile can be greatly improved, and the settlement amount of a foundation pile is reduced.
Owner:浙江坤德创新岩土工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products