Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

66results about How to "Shorten the consolidation time" patented technology

High-concentration wet filling mold bag treatment method and system for municipal solid waste incineration fly ash

The invention discloses a high-concentration wet filling mold bag treatment method for municipal solid waste incineration fly ash. Fly ash homogenization, heavy metal stabilization, dioxin detoxication, rapid hydration consolidation and landfill integration treatment are achieved through the three links of fly ash thick paste or cream preparing, high-pressure pumping or filling and mold bag water segregation or hydration consolidation, no dust pollution or wastewater discharge or ammonia smell dissipation is generated in the treatment process, discharge of fly ash landfill leachate can be greatly reduced, and meanwhile municipal and industrial sludge, silt, river sediment and the like can be collaboratively treated; the consolidated fly ash in a mold bag meets the relevant national standard requirements, and landfill treatment can be conducted on the consolidated mold bag. The invention further discloses a high-concentration wet filling mold bag treatment system for the municipal solid waste incineration fly ash. Accordingly, the defects in large-scale industrial application of traditional dry landfill for the fly ash and a low-concentration slurry filling mold bag treatment method for the fly ash can be avoided, environment-friendly, economic and safe fly ash treatment is achieved, solid waste such as sludge is collaboratively and safely treated, and the method and system can be applied to large-scale industrial production.
Owner:TIANJIN YIMING ENVIRONMENTAL TECH CO LTD

Reinforcing method of vacuum preloading lead pipe pile gas injection carbonized super-soft foundation

The invention discloses a reinforcing method of a vacuum preloading lead pipe pile gas injection carbonized super-soft foundation, and belongs to the technical field of super-soft foundation reinforcing treatment of geotechnical engineering. The reinforcing method comprises the steps of site treatment and exploration, first pile group construction and beating, spraying mixing equipment placement and debugging, curing agent spraying and mixing, first treatment system layout, vacuum preloading-gas injection carbonized treatment, first site treatment completing, continuous construction, final treatment and the like. The reinforcing method has the advantageous of a vacuum preloading method, a magnesium oxide carbonization curing method and a pipe pile composite foundation, the drainage efficiency and the infiltration diffusion efficiency of carbon dioxide are greatly improved through coordination work of vacuum preloading and pipe pile gas injection, the compacting displacement action of apipe pile on soft soil is fully utilized, mud soil is effectively glued through hydration products and carbonization products, thus the intensity of the soft soil composite foundation is enhanced, and the stability is improved. The reinforcing method has the characteristics that the treatment effect is good, the period is short, and low-carbon and environmentally-friendly and economic efficiencyare achieved, and resource utilization of industrial waste in soft foundation treatment is achieved.
Owner:NANJING FORESTRY UNIV

Drainage consolidation system and method for soft soil foundation

PendingCN108691310AProcess Safety for Drain ConsolidationImprove drainage capacitySoil preservationSiphonWater filter
The invention relates to the field of building construction, in particular to a drainage consolidation system and method for a soft soil foundation. A plastic drainage plate is vertically arranged inthe foundation; a horizontal drainage pipe is horizontally arranged and connected with the upper end of the plastic drainage plate; the horizontal drainage pipe is further connected with a vacuum pump, and the vacuum pump is further connected with a drainage trough through a pipeline; the horizontal drainage pipe is embedded through a sand cushion layer; a sealing film is further laid on the sandcushion layer; a pile carrier is arranged above the sealing film, and a water filter pipe is arranged between the sealing film and the pile carrier; one end of a siphon is connected with the water filter pipe; and the other end of the siphon is connected with the drainage trough. By means of the drainage consolidation system for the soft soil foundation, the drainage effect of the foundation is improved, so that the drainage consolidation construction has a better effect and higher efficiency; and with application of the drainage consolidation method for the soft soil foundation, the system iscreated more methodically, and the drainage consolidation process of the soft soil foundation is safer, more efficient and environmentally friendly.
Owner:CHINA HUADIAN ENG

Heating consolidation construction method for arranging electric heating rod in vertical drainage filter tube

PendingCN107740403ADoes not affect drainageWith electric heating functionSoil preservationHeat sealerElectric cables
The invention discloses a heating consolidation construction method for arranging a built-in electric heating rod in a vertical drainage filter tube. The vertical drainage filter tube is sleeved witha sleeve firstly, the bottom end of the vertical drainage filter tube is ironed level through a heat sealing machine, so that weak soil is prevented from entering the filter pipe; through a plate inserting machine or manual work, the sleeve is beaten to an appointed depth, the sleeve is then pulled out, the vertical drainage filter pipe is kept in a soil body, the vertical drainage filter pipe iscut off, and a sand cushion is exposed at the top end of the vertical drainage filter pipe; an electric heating rod is inserted into the vertical drainage filtering pipe, the electric heating rod is connected through a lead wire of an insulated waterproof rapid plug, the insulated waterproof rapid plug is connected with a rapid connector of a T cable, and the T cable is connected with a power supply system; a foundation is heated through the electric heating rod, through pile preloading or vacuum preloading or vacuum and pile combined preloading or other methods, preloading drainage consolidation is conducted on the foundation.
Owner:TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG +2

Experimental device for inclined angle-adjustable seabed slope seismic response research model based on permeating solidifying method

The invention discloses an experimental device for an inclined angle-adjustable seabed slope seismic response research model based on a permeating solidifying method and belongs to the research fieldsof earthquake, rock soil, geology, environment, and the like. The experimental device comprises an inclined angle-adjustable model box system and a permeating loading solidifying system. The experimental device is suitable for the model test research on saturated soil slope and is especially suitable for the related experiment for the related ocean soft clay slope; in order to overcome the defectthat the traditional solidifying method can hardly practically simulate the natural deposition state of soil, a permeating solidifying method is combined for solidifying the soil in the model box, sothat the soil parameters linearly change along the depth direction and the simulated natural deposition state is more close to the true natural deposition state of the seabed soil; and meanwhile, thetraditional model box is improved, a hoisting device is adopted for realizing the random adjustment for the model slope angle within a certain scope according to requirements, and the problem of soildisturbance caused by the slope preparation according to a slope-cutting method in the traditional model test is solved.
Owner:DALIAN UNIV OF TECH

Foundation reinforcement treatment method

The invention belongs to the technical field of project construction, and discloses a foundation reinforcement treatment method. The foundation reinforcement treatment method comprises the following steps of surveying a peripheral area of a foundation, and determining whether the foundation reinforcement property is ground reinforcement or underground reinforcement; determining a foundation weak area, and removing the foundation weak area; performing prepressing treatment on the geotechnical engineering foundation by a vacuum prepressing construction method; tamping the foundation by using a rammer, and compressing soil layer pores of the foundation in a rock-soil area; determining a reinforcement method; and performing hole drilling by a pile machine, inserting a grouting pipe with a nozzle into a preset position of a soil layer, and performing foundation reinforcement by a high-pressure jet grouting method. The foundation reinforcement treatment method provided by the invention has the advantages that the vacuum prepressing treatment method is reasonably used; pore water in the rock-soil body of the foundation is enabled to be rapidly discharged; the solidification time of the soil body is obviously shortened; the foundation reinforcement quality is enhanced; through the high-pressure jet grouting treatment, the bearing capacity of the geotechnical engineering foundation is enabled to be obviously improved; and the foundation reinforcing effect is better.
Owner:中化学华晋工程有限公司

Vertical and transverse drainage system and construction method

The invention relates to a vertical and transverse drainage system. The vertical and transverse drainage system comprises a vertical and transverse drainage barrel. The vertical and transverse drainage barrel is composed of a vertical drainage column and transverse plastic drainage belts, wherein the drainage column is a main drainage channel and transmits absorbed water to an upper cushion layer, and the plastic drainage belts are auxiliary drainage channels and transmit the absorbed water to the vertical drainage column. The plastic drainage belts are fixed to the flange face of a core column of the drainage column through high-strength glue and are wound around the periphery of the drainage column, the tail ends of the plastic drainage belts are bonded through low-strength glue, only one plastic drainage belt is bonded to one fracture surface, and the plastic drainage belts are spirally bonded to the periphery of the drainage column at equal intervals. The vertical and transverse drainage system overcomes the defects that in a traditional drainage solidification method, the arrangement of a drainage channel is single, and the drainage path is long, and the vertical and transverse drainage system and a construction beating method thereof are developed and can be directly used in the existing drainage solidification method for treating the soft soil foundation project.
Owner:NINGBO UNIV

Tunnel top cavity supporting method

The invention discloses a method and a structure for supporting a cavity at the top of a tunnel, relates to the field of geotechnical engineering, and aims to support an unstable cavity at the top of the tunnel after the tunnel is broken so as to safely and quickly pass through a soft and broken surrounding cavern section. According to the technical scheme, the tunnel top cavity supporting method comprises the steps that in the blasting excavation period of a soft broken surrounding rock cave section, an unstable cavity appears at the position, close to the tunnel face, of the top of a tunnel, and steel arch pieces, arch piece supports, arch feet and arch foot fixing pieces are manufactured for standby application; then bottom foot scum of the tunnel is removed, arch feet are erected on the two side walls of the tunnel respectively, and arch piece supports and steel arch pieces are fixedly installed on the arch feet respectively; slag is discharged, and the steel arch pieces of the remaining tunnel sections are installed till the tunnel face is reached; steel bars are hung on the inner sides of the arch feet, concrete is sprayed, and a structural layer is formed; and finally, the unstable cavity is backfilled through the backfilling holes. The method is used for treating the unstable cavity appearing at the top of the tunnel, close to the tunnel face, of the soft and broken surrounding cavern section.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE

Visualized test sample box for indoor geotechnical experiment

The invention discloses a visualized test sample box for an indoor geotechnical experiment. The box comprises an upper box body (1), a lower box body (2), positioning pins (3) and a top cover (4); a cylindrical concave groove (21) is formed in the middle of the lower box body (2), the edge of the lower box body (2) is provided with lower box limiting holes (22), an upper box through hole (11) is formed in the middle of the upper box body (1), and the edge of the upper box body (1) is provided with upper box limiting through holes (12); the lower box limiting holes (22) are detachably connectedwith the upper box limiting through holes (12) through the positioning pins (3); the upper box body ( 1) and the lower box body (2) are both made of transparent materials. The visualized test samplebox can be used for sample testing of the indoor geotechnical direct-shear experiment and can also be suitable for sample testing of a one-dimensional consolidation experiment, and the test experimentresult is accurate and reliable; the movement state of soil under the shearing function or the compression function can be directly observed by naked eyes or digital photographing equipment, and thestructural change and displacement of the soil can be observed.
Owner:INNER MONGOLIA UNIVERSITY

Construction device and method for multifunctional pipe pile for drainage of land reclamation and island building

The invention discloses a construction device and method for a multifunctional pipe pile for drainage of land reclamation and island building. Holes are formed in the side surfaces of pile bodies of aprefabricated pipe pile, the pipe pile is wrapped with geotextile, an upper piston is driven by expansion and shrinkage of a hydraulic liner to lift and drop vertically along guide columns, and hingeassemblies are driven to bend; the guide columns and the hinge assemblies are arranged between the upper piston and a lower piston, and the hinge assemblies are mounted on the guide columns; slurry enters upper spherical hinges through grouting ports, passes through upper linkage pipes, enters middle spherical hinges and is sprayed out by spray nozzles; the prefabricated pipe pile is partially embedded into submarine soil mass, layered placement for drainage is performed repeatedly in a sandy soil and soft soil layered alternate manner, grouting is performed after solidification, and different outwards grouting angles of a grouting fluid from the side wall holes of the pile correspond to different functions. The construction device and method have the advantages that bearing capacity, pull resistance and lateral resistance of a pile foundation are improved, and the bearing capacity of the pile foundation is improved effectively; expenditures are reduced, construction efficiency is increased, the requirement for fast island forming is met, and differential settlement of filled soil layers is controlled effectively.
Owner:ZHEJIANG UNIV

Fast tensioning anchor cable structure and construction method thereof

The invention discloses a fast tensioning anchor cable structure. The fast tensioning anchor cable structure comprises anchor cable steel strands, a primary grouting pipe, a secondary grouting pipe, aguiding member and binding members, wherein the anchor cable steel strands are arranged in drilling holes; the primary grouting pipe extends into the drilling holes and is used for performing primarygrouting on the surrounding rock, 1-3m from openings of the drilling holes, in the drilling holes to form a primary grouting part used for closing the openings of the drilling holes; the secondary grouting pipe extends into the drilling holes and is used for performing secondary grouting on other areas not subjected to primary grouting in the drilling holes; the guiding member is disposed in thedrilling for the anchor cable steel strands to pass through to guide the anchor cable steel strands to enter into the drilling holes; and the binding members are used for binding the anchor cable steel strands disposed in the drilling holes. The gripping force and anchoring force between the steel strands and a grouting body are effectively increased, meanwhile, the consolidation time of the grouting body is greatly reduced, so that the anchor cable construction is completed within 15 hours, and a fast tensioning anchor cable supporting structure is provided for a weak surrounding rock long-span tunnel with short self-stabilization time.
Owner:CHINA RAILWAY ENG CONSULTING GRP CO LTD

Cohesive soil large-scale triaxial sample consolidating apparatus and consolidating method thereof

The invention discloses a cohesive soil large-scale triaxial sample consolidating apparatus and a consolidating method thereof. The consolidating apparatus comprises a triaxial sample, a pedestal, a top cover, a rubber gasket, an electrode, a DC power supply, a bottom water penetrating board, a top water penetrating board and a combined insulated board; periphery of the cohesive soil triaxial sample is isometrically provided with electrodes, a central axis of the triaxial sample is provided with electrodes, electrodes arranged at the periphery are connected with the bottom water penetrating board at the bottom of the triaxial sample, the bottom water penetrating board is communicated with a DC power supply '-'by the combined insulated board, the electrode arranged on the central axis is connected with the top water penetrating board, the top water penetrating board is communicated with the DC power supply '+' by the combined insulated board, and the combined insulated board is composed of an insulated board, a spring and a contact. When the apparatus is used, the triaxial sample is prepared on the pedestal, simultaneously electrodes are arranged in the triaxial sample, communication between electrodes and leads are guaranteed, a rubber membrane is bundled, a confining pressure is applied, and the DC power supply is powered on for carrying out the triaxial sample consolidation. The consolidating apparatus has the advantages of simple structure, convenient operation, reliability, safety, substantially shortened consolidating time, and reduced test time and manpower.
Owner:HOHAI UNIV

Hot-melting bonding guide pipe type plastic drainage plate

PendingCN107842016ALarge water flowWater capacity is availableSoil preservationMechanical engineeringPost treatment
The invention discloses a hot-melting bonding guide pipe type plastic drainage plate. The hot-melting bonding guide pipe type plastic drainage plate comprises a plastic core plate and a water-permeable filter film wrapping the outer side of the plastic core plate. A drainage groove is formed in the plastic core plate. A center guide pipe used for increasing the overall discharge capacity of the drainage plate, improving the overall strength of the drainage plate and expanding the use function of the drainage plate is arranged in the middle of the plastic core plate. Evenly-distributed water-permeable holes are formed in the pipe wall of the center guide pipe. The water-permeable filter film and the plastic core plate are bonded into a whole through the hot-melting bonding process. According to the hot-melting bonding guide pipe type plastic drainage plate, the phenomenon of poor drainage and even drainage plate failures caused by clogging is solved, and the work efficiency of the drainage plate is effectively improved; and in addition, through the additionally-arranged center guide pipe, the discharge capacity in unit time of the drainage plate is increased, the solidification timeis shortened, meanwhile, the function of the drainage plate is expanded, and the drainage plate can double as a tool for soil foundation aftertreatment.
Owner:TIANJIN UNIV

Construction Method of Gravel Pile Applicable to Saturated Soft Soil

ActiveCN106836205BReduce load capacityRealize small pile distance constructionBulkheads/pilesSoil preservationCrushed stoneRebar
The invention discloses a grave pile construction method applicable to saturated soft soil, wherein the grave pile construction method comprises the following steps: sinking a first seamless steel sleeve into hard soil by a certain depth, and finishing pore-forming construction in the first seamless steel sleeve, sinking a second seamless steel sleeve in the hard soil; finishing the pore-forming construction in the second seamless steel sleeve, adopting a grading gravel filler to fill pile holes in the second seamless steel sleeve; adopting the grading gravel filler to fill pile holes between the first seamless steel sleeve and the second seamless steel sleeve until the pile holes being flush with a first scale plate form the bottom; sinking and placing a reinforcement cage between the first seamless steel sleeve and the second seamless steel sleeve, wherein the internal side surface of the reinforcement cage is laid with geotechnical cloth; adopting the grading filler to fill the pile holes between the first seamless steel sleeve and the second seamless steel sleeve until the pile holes being flush with a second scale plate from the bottom, repeating the steps until reaching a top layer of the saturated soft soil. By adopting the grave pile construction method provided by the invention, a pile body with small pile diameter is prevented from being slant and deforming when adopting construction of quincuncial piles distribution.
Owner:DA CHENG KE CHUANG INFRASTRUCTURE CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products