Grouting pile head breaking and removing method

A technology for cast-in-place piles and pile heads, which is applied to sheet pile walls, buildings, infrastructure projects, etc., can solve the problems of high hardness and strength, large amount of chisel removal, and cumbersome removal of cast-in-place pile heads, and achieves simple production, The effect of reducing machinery and labor costs, reducing breakout time

Inactive Publication Date: 2018-08-28
CHINA MCC20 GRP CORP
View PDF1 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] It can be seen that the removal of the pile head of the cast-in-situ pile is relatively cumbersome, and the pile head will be broken after all the piles are constructed. Chiseling causes a large workload

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] The cast-in-place pile head removal method of the present invention comprises:

[0014] 1. When processing cast-in-situ pile reinforcement cages, insert each steel bar on the top of the cage into a plastic tube. The length of the plastic tube starts from the design pile top position to the top of the steel cage. The diameter of the plastic tube is 3mm larger than the diameter of the steel bar;

[0015] 2. After inserting the plastic pipe, tie the bottom of the pipe tightly with tape and iron wire, pour yellow sand, sawdust, etc. into the pipe for isolation, seal the top of the pipe after filling, and tie it tightly with iron wire to prevent muddy water from entering when pouring concrete;

[0016] 3. After the cast-in-place pile is constructed, when the pile head of the concrete poured pile is broken, drill four separation holes at equal intervals around the pile at the design pile top elevation.

[0017] 4. After the holes are drilled, use a pneumatic pick to make symm...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to grouting piles, in particular to pile heads of the grouting piles. A grouting pile head breaking and removing method includes the steps that when a grouting pile steel reinforcement cage is machined, each steel reinforcement of the top of the cage is sleeved with a plastic pipe, the length of each plastic pipe is designed from the designed pile top position to the top of the steel reinforcement cage, and the diameter of each plastic pipe is larger than that of the corresponding steel reinforcement; the pipe bottoms of the plastic pipes are tightened with adhesive tapeand iron wires, isolation powder fills in the plastic pipes, after the plastic pipes are full of the isolation powder, the pipe tops of the plastic pipes are sealed, and sealed pipe openings of the plastic pipes are tightened with iron wires; after construction of the grouting piles is finished, during breaking and removing of the pile heads of the concrete grouting piles, four separation holes are drilled at equal intervals around the piles at the designed pile top elevation, and the diameters of the holes are slightly smaller than the diameter of an air pick drill bit; symmetrical impact isperformed in the four separation holes through an air pick, and the concrete pile heads are directly cut off in the positions; and holes are symmetrically drilled in the positions one third away fromthe upper ends of the pile heads, two steel reinforcement hanging rings are mounted, the cut-off pile heads are hung away with machinery, and breaking and removing work of the pile heads is finished.By means of the grouting pile head breaking and removing method, the difficulty and intensity of the pile head breaking and removing are reduced.

Description

technical field [0001] The invention relates to cast-in-situ piles, in particular to pile heads of cast-in-place piles. Background technique [0002] In construction engineering, the pile head of the concrete pouring pile will exceed the design pile top elevation by at least 500mm during the actual pouring of concrete. This part is used as the height of the pile. elevation. The usual practice is to dig out the pile top to the design elevation after the construction of the cast-in-situ pile, mark the position of the designed pile top, and then use a pneumatic pick to chisel out the steel bars of the cast-in-situ pile along the marked circle until all the piles wrapped in the pile head are covered. Until the steel bars in the concrete are chiseled out, since there is no steel bar in the remaining middle part of the concrete, the pneumatic pick can be driven directly from the level of the design pile top level, and the concrete pile head will be interrupted from this position,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D9/00
CPCE02D9/00
Inventor 施群凯
Owner CHINA MCC20 GRP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products