High-temperature bolt steel BG25Cr2MoVA and preparation method thereof
A high-temperature bolt and steel technology, applied in the direction of process efficiency improvement, furnace type, furnace, etc., can solve the problems of high rolling mill resistance, slow production rhythm, high cost, reduce the influence of steel resistance, and improve the equiaxed crystal ratio. , the effect of small stress on steel
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2018-09-14
- Estimated Expiration
- Not applicable · inactive patent
Abstract
Description
technical field
[0001] The invention relates to the technical field of steel preparation, and in particular provides a steel BG25Cr2MoVA for high-temperature bolts and a preparation method thereof. Background technique
[0002] The commissioning of large-capacity and high-parameter generating units has promoted the great development of China's power system. Therefore, the demand for steel for high-temperature bolts of turbines is also increasing. The quality of bolt steel is related to the operation stability of supercritical million-unit units. , the requirements for product quality are getting higher and higher. At present, steel for high-temperature bolts of turbines produced by various steel mills is mostly produced by die casting, with low yield, high cost, small output, slow production rhythm, and the use situation is not optimistic. The above question:
[0003] (1) The smelting rhythm of electric furnace continuous casting is fast, the ratio of molten iron is small, ...
Examples
Embodiment 1
[0030] Steel BG25Cr2MoVA for high temperature bolts, by weight percentage, includes the following components: C: 0.23%, Si: 0.35%, Mn: 0.54%, P≤0.015%, S≤0.012%, Cr: 1.72%, Mo: 0.28%, V: 0.20%, Ni≤0.15%, Cu≤0.15%, Alt: 0.040%, the balance is iron and unavoidable impurities.
[0031] The preparation method of steel BG25Cr2MoVA for this high temperature bolt is as follows:
[0032] Blast furnace molten iron undergoes pretreatment in turn→electric furnace smelting→refining furnace LF→vacuum degassing VD→medium billet continuous casting 235mm×265mm continuous casting slab→walking heating furnace heating→high pressure water descaling→rough rolling mill rolling→continuous rolling unit →slow cooling→annealing→finishing→flaw detection→inspection to obtain steel,
[0033] Among them, the electric furnace smelting adopts 50t electric furnace smelting, and the carbon reaches the target content requirement of 0.23%, and then the steel is deoxidized and alloyed;
[0034] The refining fur...
Embodiment 2
[0039] High temperature bolt steel BG25Cr2MoVA, by weight percentage, includes the following components: C: 0.27%, Si: 0.20%, Mn: 0.62%, P≤0.015%, S≤0.012%, Cr: 1.64%, Mo: 0.32%, V: 0.24%, Ni≤0.15%, Cu≤0.15%, Alt: 0.020%, the balance is iron and unavoidable impurities.
[0040] The preparation method of steel BG25Cr2MoVA for this high temperature bolt is as follows:
[0041] Blast furnace molten iron undergoes pretreatment in turn→electric furnace smelting→refining furnace LF→vacuum degassing VD→medium billet continuous casting 235mm×265mm continuous casting slab→walking heating furnace heating→high pressure water descaling→rough rolling mill rolling→continuous rolling unit →slow cooling→annealing→finishing→flaw detection→inspection to obtain steel,
[0042] Among them, the electric furnace smelting adopts 50t electric furnace smelting, and the carbon reaches the target content requirement of 0.27%, and then the steel is deoxidized and alloyed;
[0043] The refining furnace ...
Embodiment 3
[0048] High temperature bolt steel BG25Cr2MoVA, by weight percentage, includes the following components: C: 0.25%, Si: 0.25%, Mn: 0.58%, P≤0.012%, S≤0.010%, Cr: 1.68%, Mo: 0.30%, V: 0.22%, Ni≤0.10%, Cu≤0.10%, Alt: 0.030%, the balance is iron and unavoidable impurities.
[0049] The preparation method of steel BG25Cr2MoVA for this high temperature bolt is as follows:
[0050] Blast furnace molten iron undergoes pretreatment in turn→electric furnace smelting→refining furnace LF→vacuum degassing VD→medium billet continuous casting 235mm×265mm continuous casting slab→walking heating furnace heating→high pressure water descaling→rough rolling mill rolling→continuous rolling unit →slow cooling→annealing→finishing→flaw detection→inspection to obtain steel,
[0051] Among them, the electric furnace smelting adopts 50t electric furnace smelting, and the carbon reaches the target content requirement of 0.25%, and then the steel is deoxidized and alloyed;
[0052] The refining furnace ...