Construction Technology of Frozen Hole in Roadway
A construction technology and technology of freezing holes, which are applied in tunnels, mining equipment, earth-moving drilling, etc., can solve the problems of well wall damage, ground collapse, drilling rig equipment damage, etc., and achieve the effect of solving the secondary damage of the well wall
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0008] The present invention comprises the following steps: 1), first use the Φ245mm drill bit to drill the hole 1 downward from the ground, to 80-100mm inside the roadway roof 4; 2), pull out the drill bit, place 3, to the depth of the drill hole; 3), fill the cement slurry outside the steel pipe 3 and the annular space of the drill hole, and fix the steel pipe 3; 4), penetrate the core drill bit of Φ190mm into the steel pipe 3, break through the roadway roof 4, the core hole appears on the roadway roof 4, and then pull out the core bit; Leakage in the hole into the roadway 7 forms a conical material pile 6, and when the material pile 6 is close to the coring hole, stop filling the material; 6), then continue to fill with the compound of cement+water glass through the steel pipe 3 until it exceeds The roof 4 exceeds 10m, that is, the plugging process ends. During the plugging process, various additives are added to the cement slurry to make the density, viscosity, solidific...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 